Pass4Test의 EXIN EX0-113 (TMap Next Foundation) 덤프는 몇십년간 IT업계에 종사한 전문가들이EXIN EX0-113 (TMap Next Foundation) 실제 시험에 대비하여 제작한 시험준비 공부가이드입니다. EXIN EX0-113 (TMap Next Foundation) 덤프공부가이드로 시험준비공부를 하시면 시험패스가 쉬워집니다. 공부하는 시간도 적어지고 다른 공부자료에 투자하는 돈도 줄어듭니다. Pass4Test의 EXIN EX0-113 (TMap Next Foundation) 덤프는 EXIN EX0-113 (TMap Next Foundation) 시험패스의 특효약입니다.
NO.1 Which defect has an internal cause that can be solved within the test team?
A. a defect in the test basis
B. a defect in the test specification
C. a defect in the test object
Answer: B
NO.2 Under which circumstance can Exploratory Testing be used effectively?
A. when experienced testers with domain knowledge are available
B. when testing must be as brief as possible on the critical path of the project
C. when critical functionality, failure of which can cause severe damage, must be tested
Answer: A
NO.3 See the definition below:
Tests in which the supplying party demonstrates that the product particularly meets the functional and
non-functional specifications and the technical design, among other things.
Of which test level is this the definition?
A. acceptance test
B. development test
C. system test
Answer: C
NO.4 In which Map phase activity does the pre-test take place?
A. Defining central starting points
B. Intake of the test object
C. Specifying the test object intake
D. Executing (re)tests
Answer: B
NO.5 What is not an advantage of applying a test design technique and recording it in the test specifications?
A. that the tests are reproducible
B. that the test specifications are transferable
C. that coverage of 100% is achieved
D. that it provides a justified elaboration of the test strategy
Answer: C