EXIN EX0-113 (TMap Next Foundation) 시험은 인기있는 IT자격증을 취득하는데 필요한 국제적으로 인정받는 시험과목입니다. EXIN EX0-113 (TMap Next Foundation) 시험을 패스하려면 Pass4Test의 EXIN EX0-113 (TMap Next Foundation) 덤프로 시험준비공부를 하는게 제일 좋은 방법입니다. Pass4Test덤프는 IT전문가들이 최선을 다해 연구해낸 멋진 작품입니다. EXIN EX0-113 (TMap Next Foundation) 덤프구매후 업데이트될시 업데이트버전을 무료서비스료 제공해드립니다.
NO.1 In which Map phase activity does the pre-test take place?
A. Defining central starting points
B. Intake of the test object
C. Specifying the test object intake
D. Executing (re)tests
Answer: B
NO.2 Which defect has an internal cause that can be solved within the test team?
A. a defect in the test basis
B. a defect in the test specification
C. a defect in the test object
Answer: B
NO.3 Under which circumstance can Exploratory Testing be used effectively?
A. when experienced testers with domain knowledge are available
B. when testing must be as brief as possible on the critical path of the project
C. when critical functionality, failure of which can cause severe damage, must be tested
Answer: A
NO.4 See the definition below:
Tests in which the supplying party demonstrates that the product particularly meets the functional and
non-functional specifications and the technical design, among other things.
Of which test level is this the definition?
A. acceptance test
B. development test
C. system test
Answer: C
NO.5 What is not an advantage of applying a test design technique and recording it in the test specifications?
A. that the tests are reproducible
B. that the test specifications are transferable
C. that coverage of 100% is achieved
D. that it provides a justified elaboration of the test strategy
Answer: C