Pass4Test는 여러분이  ISQI Certifications IREB-IT-CQ03시험 패스와 추후사업에 모두 도움이 되겠습니다.Pass4Test제품을 선택함으로 여러분은 시간과 돈을 절약하는 일석이조의 득을 얻을수 있습니다. ISQI Certifications IREB-IT-CQ03 인증시험패스는 아주 어렵습니다. 자기에 맞는 현명한 학습자료 선택은 성공의 지름길을 내딛는 첫발입니다. 퍼펙트한 자료만이  ISQI Certifications IREB-IT-CQ03시험에서 성공할수 있습니다. Pass4Test시험문제와 답이야 말로 퍼펙트한 자료이죠. Pass4Test   ISQI Certifications IREB-IT-CQ03인증시험자료는 100% 패스보장을 드립니다.





NO.1 For an interview, you have prepared a use case diagram for the system to be
specified. You

decide to talk through a use case in detail with the
stakeholder. You receive very useful feedback

which must now be documented.
Which of the following means of expression is least suitable to

document the
details of a single use case? (1 Point)

A. State diagram

B. Activity
diagram

C. Natural language

D. Context diagram

E. Class
diagram

Answer: D



NO.2 Which sentence best characterises the term
"stakeholder"? (1 Point)

A. The external actors interacting with a system and
the technical interfaces to surrounding systems

are designated as
stakeholders.

B. Stakeholders are persons and organisations affected by the
development and the use of the

system or of the product.

C. Stakeholders
are special interest representatives who are responsible for the approval of the
first

project phase.

D. A stakeholder is responsible for the
administration of the software development environment.

Answer: B



NO.3
CORRECT TEXT

You have been commissioned to analyze a change request for its
possible impact. Which of the

following aspects must be analyzed for this? (2
Points)

Answer: B,C,E,G



NO.4 Requirements elicitation: Your company
has received a customer contract to develop a system

for the scheduling of
the customer's delivery vans.

It is your task to identify the requirements
for this scheduling system. You have arranged

appointments for interviews
with three key members of the customer's staff, and are now
preparing

interview questions.

Which of the questions below are
appropriate interview questions for the requirements elicitation?

(2
Points)

A. What are the most important technical terms for the application
and how are they defined?

B. If the delivery deadline is not met, is a
contract penalty to be paid?

C. What data quantities / data rates are to be
processed?

D. When is the installation of the completed system to be
started?

Answer: C



NO.5 As part of the "UniKasso" project, the
"CRETIL" company is standardising the payment

methods for all customers. The
requirements specification has been created and the first release
is

currently being implemented.

This week, the management has decided to
include the implementation of the "credit card" mode of

payment in the first
release and to shift the "direct debit" mode of payment to the second
release.

The test manager receives the order to adjust the test planning
accordingly.

Which particular characteristic of the requirements will
facilitate the work of the test manager

significantly in this respect? (1
Point)

A. Coherence

B. Testability

C. Flexibility

D. Stability

E.
Traceability

Answer: E



NO.6 Which two statements are correct with
regard to the introduction of a requirements

engineering tool? (2
Points)

A. The introduction of a tool defines the future requirements
engineering approach

B. Risks associated with the introduction can be
identified through a pilot operation

C. The requirements engineering
processes must be clearly defined before introduction

D. The license costs
are generally the greatest cost block relating to the introduction of
a

requirements engineering tool

Answer: C,D