IT인증,IT자격증,IT자격증시험,IT인증시험

http://www.pass4test.net/

IBM PureFlex Systems C4120-785 공부자료

IBM PureFlex Systems C4120-785시험을 등록하였는데 시험준비를 어떻게 해애 될지 몰라 고민중이시라면 이 글을 보고 Pass4Test를 찾아주세요. Pass4Test의 IBM PureFlex Systems C4120-785덤프샘플을 체험해보시면 시험에 대한 두려움이 사라질것입니다. Pass4Test의 IBM PureFlex Systems C4120-785덤프는  IBM PureFlex Systems C4120-785실제시험문제를 마스터한 기초에서 제작한 최신시험에 대비한 공부자료로서 시험패스율이 100%입니다. 하루 빨리 덤프를 마련하여 시험을 준비하시면 자격증 취득이 빨라집니다.

 

NO.1 The sales expert is preparing a Flex System proposal for a client.
What would be the most compelling reason for the sales expert to lead with the IBM Flex System
EN4023 10Gb Scalable Switch?
A. The client wants I/O modules that support Cisco Fabric Path technology
B. The client wants a low-cost solution that supports Fibre Channel Over Ethernet (FCoE)
C. The client wishes to implement a Juniper Virtual Chassis solution to simplify configuration and
management
D. The client has invested in Brocade Virtual Cluster Switching and wishes to extend the cluster to the
chassis switches
Answer: B

NO.2 A large PureFlex prospect is interested in cloud, and asks the sales expert how to explore the
cloud options in their complex environment.
Which client engagement method explores client needs and develops solutions?
A. Cloud Workshop
B. vCloud Director
C. SmartCloud Entry
D. Cloud Demonstration
Answer: B

NO.3 A client has an existing infrastructure of x86 and Power servers running in small regional offices.
They are asking for ideas on how to make their IT environment more efficient.
What is the best suggestion a PureFlex sales expert can make to address this question?
A. Highlight how PureFlex has the ability to integrate the network switching and storage fabric for the
x86 and Power environments, reducing cost and complexity.
B. Suggest that the client deploy the SmartCloud offerings on PureFlex x86 compute nodes to migrate
the Power workloads to x86 Linux and save money while gaining flexibility.
C. Assure the client that the cost of a PureFlex solution is always less expensive than rack or blade
servers and ask for a meeting to create a custom configuration for that client's server needs.
D. Propose that IBM offer a Storage Infrastructure Optimization study to create recommendations on
how to spend less on the storage environment since that is driving the highest cost in the client's
environment.
Answer: A

NO.4 A small manufacturing company is interested in a platform to support their new SAP CRM
deployment. Currently installed systems include IBM BladeCenter, HP BladeSystem. and standalone
servers from various vendors. They have standardized on the use of VMware on x86, and are 70%
virtualized. There are no Power Systems servers currently installed.
They are very pleased with their IBM XIV storage, particularly the simplicity, and continue to expand
with additional XIV Gen3 capacity when required.
The current data center network is based on Cisco Catalyst 1Gb switches at the edge with Cisco
Nexus 5596 10Gb core switches. They also have a legacy Brocade SAN. For systems management they
use vendor-specific element management tools.
They have two sites. A main site and a secondary site, and they currently have limited high availability
capabilities. They have decided they are not interested in hosted Cloud services at this time.
They have a small staff, so ease-of-use and simplification are particularly important. The Cisco sales
team has convinced them that FCoE is easier; consequently. FCoE is very attractive to them.
They typically focus on the tactical administration and day-to-day activities. Decision making is driven
largely by technical staff. In addition to IBM PureSystems. they are considering Cisco UCS.
After confirming that the client's storage is on the SSIC, what PureFlex competitive advantage should
the sales expert emphasize with the client?
A. Host mapping
B. Deduplication
C. Thin provisioning
D. External virtualization
Answer: A

NO.5 A client is thinking of investing in an IBM PureFlex solution for their server environment.
They want to know if the investment they are about to make will be returned in time. During the
meeting, the sales expert wants to calculate and present a rough estimate of the savings.
What tool would the sales expert use in the pre-sales part of the engagement for estimating the
Return on Investment of theIBM PureFlex offering?
A. IBM Zodiac Tool set
B. IBM TCOnow! and IBM ROInow!
C. IBM PureFlex System TCO Analysis Tool Alinean
D. IBM Advanced Technical Support Server Consolidation Monitor
Answer: B

NO.6 A client has a well established infrastructure including Ethernet and Fibre Channel SAN. They
are considering a PureFlex solution based on FCoE.
Which is the most effective argument in favor of implementing FCoE as part of the solution?
A. Easier management
B. Higher availability
C. Potential to reduce costs
D. Better storage performance
Answer: B

NO.7 The sales expert is in discussion with a current client running System i and x86 servers. They
need to replace their single System i server since it will go out of maintenance. The goal of IT
management is to have a solution with higher availability to run their application.
Assuming a multi-phase technology refresh featuring PureFlex, starting with the System i, what
solution should the sales expert advise this client?
A. A Power node with dual VIOS and GPFS
B. A Power node with single VIOS and PowerHA
C. A Power node with dual VIOS with attached SAN storage
D. A Power node with single VIOS with local disks in RAID 1
Answer: B

Posted 2014/12/8 10:30:25  |  Category: IBM  |  Tag: C4120-785 공부자료