IASSC ICGB (IASSC Certified Lean Six Sigma Green Belt)시험은 중요한 IT인증자격증을 취득하는 필수시험과목입다. IASSC ICGB (IAS SC Certified Lean Six Sigma Green Belt)시험을 통과해야만 자격증 취득이 가능합니다.자격증을 많이 취득하면 자신의 경쟁율을 높여 다른능력자에 의해 대체되는 일은 면할수 있습니다.Pass4Test에서는 IASSC ICGB (IASSC Certified Lean Six Sigma Green Belt)시험대비덤프를 출시하여 여러분이 IT업계에서 더 높은 자리에 오르도록 도움드립니다. 편한 덤프공부로 멋진 IT전문가의 꿈을 이루세요.
NO.1 SPC on the outputs is more preferred than SPC on the inputs when implementing SPC for your
process.
A. True
B. False
Answer: B
NO.2 When it comes to Control one of the most effective means of eliminating defects is to
_________________ .
A. Train personnel often and thoroughly
B. Keep a Six Sigma project going on the process at all times
C. Design defect prevention into the product
D. Have each process consist of no more than five steps
Answer: C
NO.3 As part of a Visual Factory plan __________ cards are created and utilized to identify areas in
need of cleaning and organization.
A. Kanban
B. Kaizen
C. Poke-Yoke
D. WhoSai
Answer: A
NO.4 The use of station warning lights, tool boards and jidohka devices in the application of Lean
accomplish which of these principles?
A. Pilferage Minimization
B. Visual Factory
C. Management Awareness
D. Operator Attentiveness
Answer: B
NO.5 The use of Kanbans work best with pull systems for determining the timing of which products
or
services are produced.
A. True
B. False
Answer: A
NO.6 A Lean Principle that addresses efficiency by the process worker is called
____________________?
A. Visual Factory
B. Supervising
C. Training
D. Standardizing
Answer: D
NO.7 Significant variation in process performance is a consequence of several causes that can be
classified using which of the terminologies shown. (Note: There are 2 correct answers).
A. Common
B. Random
C. Uneducated
D. Special
E. Vital
Answer: A,D
NO.8 The Lean Principle action in the 5S approach that deals with having those items needed
regularly
at hand and those items need less regularly stored out of the way is known as ___________.
A. Shining
B. Standardizing
C. Sustaining
D. Sorting
Answer: D
NO.9 When a Belt applies the practice of Poka-Yoke to a project challenge she is attempting to make
certain the activity is _______________ .
A. Well documented
B. Removed from the line
C. Mistake proofed
D. Highly visible
Answer: C
NO.10 While management of a company must set the stage for all improvement efforts, which of
these
5S’s is primarily driven by management?
A. Straighten
B. Sort
C. Shine
D. Sustain
Answer: D