IT인증,IT자격증,IT자격증시험,IT인증시험

http://www.pass4test.net/

IASSC ICBB (IASSC Certified Lean Six Sigma Black Belt) 시험덤프

Pass4Test의 경험이 풍부한 IT전문가들이 연구제작해낸 IASSC ICBB (IASSC Certified Lean Six Sigma Black Belt) 덤프는 시험패스율이 100%에 가까워 시험의 첫번째 도전에서 한방에 시험패스하도록 도와드립니다. IASSC ICBB (IASSC Certified Lean Six Sigma Black Belt)  덤프는  IASSC ICBB (IASSC Certified Lean Six Sigma Black Belt) 최신 실제시험문제의 모든 시험문제를 커버하고 있어 덤프에 있는 내용만 공부하시면 아무런 걱정없이 시험에 도전할수 있습니다.

 

 

NO.1 Special Cause Variation falls into which two categories?

A. Natural & Unnatural

B. Short Term & Long Term

C. Assignable & Pattern

D. Attribute & Discreet

Answer: C

 

NO.2 Common and ______________ Cause Variation are the focus of Statistical Process Control.

A. Uncommon

B. Ordinary

C. Special

D. Selective

Answer: C

 

NO.3 Range Charts are the technique used to determine if Special Causes are occurring within the

subgroups of the ______________.

A. Histograms

B. SPC Charts

C. NP Charts

D. Pareto Charts

Answer: B

 

NO.4 If the production is for higher volume and monitoring and the Mean and variability is to be

monitored for four machines producing product and the characteristic to be monitored is Variable

Data, which SPC Chart is best to be selected?

A. Xbar-R Chart

B. Individual-MR Chart

C. NP Chart

D. CUSUM Chart

Answer: A

 

NO.5 Control Charts were developed by Dr. Shewhart to track data over time. To detect Special

Cause

variation the Control Charts use which of these?

A. Data shift analysis

B. Outlier analysis methods

C. Center Line and Control Limits

D. None of the above

Answer: C

 

NO.6 For her injection molding project a Belt needed to track the percentage of defectives of a

particular

sample set so she used a ___________ to display the data?

A. Individual Chart

B. C Chart

C. Xbar Chart

D. P Chart

Answer: D

 

NO.7 Following the completion of a LSS project the Belt not only creates a Control Plan he also

develops a _____________ so those involved in the process know what to do when the critical

metrics move out of spec.

A. Response Plan

B. Call List

C. Chain-of-Command

D. Defect Analysis Plan

Answer: A

 

NO.8 When a Belt Poka-Yoke’s a defect out of the process entirely then she should track the activity

with a robust SPC system on the characteristic of interest in the defect as an early warning

system.

A. True

B. False

Answer: B

 

NO.9 A ___________ is used primarily to track the stability of the average value of a metric of

interest.

A. NP Chart

B. Xbar-R Chart

C. I-MR Chart

D. C Chart

Answer: B

 

NO.10 Which of these graphs demonstrates conditions which would be sufficient to enable OCAP for

the

process?

A. Xbar Chart

B. Time Series Chart

C. Neither

D. Both

Answer: A

 

 

 
Posted 2013/6/1 5:55:53  |  Category: 미분류  |  Tag: