IASSC ICBB (IASSC Certified Lean Six Sigma Black Belt) 시험덤프

Pass4Test의 IASSC ICBB (IASSC Certified Lean Six Sigma Black Belt) 덤프를 선택하여  IASSC ICBB (IASSC Certified Lean Six Sigma Black Belt) 시험공부를 하는건 제일 현명한 선택입니다. 시험에서 떨어지면 덤프비용 전액을 환불처리해드리고  IASSC ICBB (IASSC Certified Lean Six Sigma Black Belt) 시험이 바뀌면 덤프도 업데이트하여 고객님께 최신버전을 발송해드립니다. IASSC ICBB (IASSC Certified Lean Six Sigma Black Belt) 덤프뿐만아니라 IT인증시험에 관한 모든 덤프를 제공해드립니다.

 

 

NO.1 A ___________ is used primarily to track the stability of the average value of a metric of

interest.

A. NP Chart

B. Xbar-R Chart

C. I-MR Chart

D. C Chart

Answer: B

 

NO.2 Control Charts were developed by Dr. Shewhart to track data over time. To detect Special

Cause

variation the Control Charts use which of these?

A. Data shift analysis

B. Outlier analysis methods

C. Center Line and Control Limits

D. None of the above

Answer: C

 

NO.3 For her injection molding project a Belt needed to track the percentage of defectives of a

particular

sample set so she used a ___________ to display the data?

A. Individual Chart

B. C Chart

C. Xbar Chart

D. P Chart

Answer: D

 

NO.4 Which of these graphs demonstrates conditions which would be sufficient to enable OCAP for

the

process?

A. Xbar Chart

B. Time Series Chart

C. Neither

D. Both

Answer: A

 

NO.5 If the production is for higher volume and monitoring and the Mean and variability is to be

monitored for four machines producing product and the characteristic to be monitored is Variable

Data, which SPC Chart is best to be selected?

A. Xbar-R Chart

B. Individual-MR Chart

C. NP Chart

D. CUSUM Chart

Answer: A

 

NO.6 Following the completion of a LSS project the Belt not only creates a Control Plan he also

develops a _____________ so those involved in the process know what to do when the critical

metrics move out of spec.

A. Response Plan

B. Call List

C. Chain-of-Command

D. Defect Analysis Plan

Answer: A

 

NO.7 Common and ______________ Cause Variation are the focus of Statistical Process Control.

A. Uncommon

B. Ordinary

C. Special

D. Selective

Answer: C

 

NO.8 When a Belt Poka-Yoke’s a defect out of the process entirely then she should track the activity

with a robust SPC system on the characteristic of interest in the defect as an early warning

system.

A. True

B. False

Answer: B

 

NO.9 Range Charts are the technique used to determine if Special Causes are occurring within the

subgroups of the ______________.

A. Histograms

B. SPC Charts

C. NP Charts

D. Pareto Charts

Answer: B

 

NO.10 Special Cause Variation falls into which two categories?

A. Natural & Unnatural

B. Short Term & Long Term

C. Assignable & Pattern

D. Attribute & Discreet

Answer: C

 