연구결과에 의하면 Microsoft Visual Studio 2012 70-497시험은 너무 어려워 시험패스율이 낮다고 합니다. Pass4Test의 Microsoft Visual Studio 2012 70-497덤프와 만나면 Microsoft Visual Studio 2012 70-497시험에 두려움을 느끼지 않으셔도 됩니다. Pass4Test의 Microsoft Visual Studio 2012 70-497덤프는 엘리트한 IT전문가들이 실제시험을 연구하여 정리해둔 퍼펙트한 시험대비 공부자료입니다. 저희 덤프만 공부하시면 시간도 절약하고 가격도 친근하며 시험준비로 인한 여러방면의 스트레스를 적게 받아 Microsoft Visual Studio 2012 70-497시험패스가 한결 쉬워집니다.
NO.1 You are using Microsoft Test Manager (MTM). You are using the Microsoft Solution Framework
(MSF)
for Agile Software Development process template. SharePoint integration and reporting are
enabled.
You want to assess the progress of your team s testing effort. To do this, you need to:
- identify gaps in test coverage,
- monitor test progress for each requirement, and
- identify how many test cases are passing or failing for each requirement.
What should you do?
A. From the team portal, open the User Story Test Status Excel Report.
B. Open the test plan in MTM and look at the test plan status.
C. From the team portal, open the Test Plan Progress Excel Report.
D. From Team Explorer, open the Stories Progress report.
Answer: A
NO.2 You plan to roll out Microsoft Test Manager (MTM). Phase 1 testing will include manual testing
only. In
Phase 2, you will introduce automated test suites to complement manual testing. You plan to use
diagnostic data adapters for each phase. You need to provide the correct diagnostic data adapters.
Which data diagnostic adapter is only applicable to manual testing and would accomplish this goal?
A. Video Recording
B. Actions
C. Test impact
D. Event Log
E. Code coverage
Answer: B
NO.3 You are a managing test cases by using Microsoft Test Manager (MTM). You create a new
configuration.
You need to select the new configuration for all test cases in a test suite.
What are two possible ways to achieve this goal? (Each correct answer presents a complete
solution.
Choose two.)
A. Select the test suite and use Select test configurations for all tests to select the new
configuration.
B. Select all of the test cases in the test suite and use Configurations to select the new configuration
for
the selected tests.
C. Select the new configuration as the default configuration for the test suite.
D. Select the test suite and use Configurations to select the new configuration for the test suite.
Answer: AB
NO.4 You are a test developer using Microsoft Test Manager (MTM). The test you are developing has
a two
validation steps that use a parameter named TotalPrice. The feature associated with TotalPrice has
changed, making the parameter and the first validation step unnecessary. The second validation
step
requires a new parameter named Price. You need to delete the TotalPrice parameter, along with its
data
values, and add the Price parameter to the second validation step.
What should you do.?
A. Delete the first validation step and rename TotalPrice to Price in the second validation step.
B. Delete the first validation step and insert the Price parameter into the second validation step.
C. Delete the two validation steps and the TotalPrice parameter, and then delete the parameter
values for
TotalPrice.
D. Delete the first validation step and insert the Price parameter into the Action column of the
second
validation step.
Answer: A
NO.5 You are using Microsoft Test Manager (MTM) to perform exploratory testing. You need to test
a
Windows Store application. You need to configure the connection to the remote device running the
Windows Store application.
What should you do? (To answer, move the three appropriate actions from the list of actions to the
answer
area and arrange them in the correct order.)
A. From the exploratory test window, use the Connect to device link.
B. Use the Modify link to configure the device.
C. Enter the device name and port and select Save.
D. From the Plan Activity, edit the test plan Properties.
E. From the Test Center Group, use the Do Exploratory Testing menu item.
F. Enter the URL of the Windows Store application.
Answer: ABD