VCAP5 Data Center Design VCAP5-DCD자료

목표를 이루는 방법은 여러가지가 있는데 어느 방법을 선택하면 가장 빨리 목표를 이룰수 있을가요? VCAP5 Data Center Design VCAP5-DCD시험을 패스하는 길에는 Pass4Test의  VCAP5 Data Center Design VCAP5-DCD덤프를 공부하는 것이 가장 좋은 방법이라는것을 굳게 약속드립니다. Pass4Test의 VCAP5 Data Center Design VCAP5-DCD덤프는 시험문제에 초점을 두어 제작된 공부자료이기에  VCAP5 Data Center Design VCAP5-DCD패스를 가장 빠른 시일내에 한방에 할수 있도록 도와드립니다.







NO.1 Which of the following is an advantage of a scaled-up architecture?

A. Fewer Larger hosts means less hardware to manage

B. Smaller hosts mean more DRS options

C. Smaller hosts translate to less time needed to recover using HA

D. Smaller servers are cheaper.

Answer: A

Explanation:

In a scaled-up architecture, Fewer servers are needed because each server can handle more virtual

machines that what a typical scaled-out server can handle. So the cluster will require fewer servers.




NO.2 A software vendor-provided best practice should be adhered to ___________. (Choose two)

A. where possible, respecting other project requirements

B. at all times because the vendor wrote and designed the software

C. in the absence of other requirements as a guide to configuration

Answer: A,C

Explanation:

A best practice is based on experience with delivering a solution. A new product will have limited

best-practice information except for vendor- or vendor-partner-based recommendations. The longer

a technology is used in a community, the more potential success; therefore, best practices may

change over time. Chapter 6, Validation, Thoughts, and Processes




NO.3 Which VMware tools driver is the balloon driver?

A. VMMEMCTL

B. VSS

C. VLance

D. None of the above

Answer: A

Explanation:

VMMEMCTL is the balloon driver. It is installed on any virtual machine that has VMware tools

installed.




NO.4 You are reviewing a VMware vSphere 5 cluster design. The system is designed to run DPM in

fully automated mode. DPM in fully automated mode ____ evacuate all templates when placed into

standby mode.

A. will

B. will not

Answer: B

Explanation:

DPM will not move powered-off virtual machines or templates. A real-life workaround is to turn off

fully automated DRS for these machines on a case-by-case basis and register them to a specific host

in the cluster for deployment usage. Chapter 4, Management/Platform Design




NO.5 The vCenter database is powered off ungracefully, along with a three cluster nodes in a

separate cluster. Will the failed existing ESXi host nodes restart correctly using Auto Deploy?

A. Yes

B. No

Answer: A

Explanation:

Auto Deploy enables an untrained IT professional to increase capacity while ensuring quality and

consistency within a cluster. However, there is a dependency on the vCenter server and Auto Deploy

server roles at different times. In this case, the ESXi hosts have already booted successfully. This

means that all subsequent reboots will be controlled using configuration from the Auto Deploy

server, not vCenter. If the vCenter database is impacted, the ESXi hosts will automatically restore.

Even in the event of no vCenter availability, hosts will use the last-known copy of a distributed

switch or the configured vSphere switch. Chapter X, Putting it all together




NO.6 Storage tiering involves ______________.

A. priority locations to migrate virtual machines

B. grouping storage to be used first

C. categorizing storage by the size of the LUNs

D. categorizing storage based on performance to meet SLAs

Answer: D

Explanation:

Storage tiering categorizes LUNs by the performance they can provide to enable architects to place

workloads on the appropriate storage tiers to ensure that the workloads are within the SLA

standards.




NO.7 You are working on a virtual guest design for the deployment of a critical business application.

The software vendor has provided you with some projected workloads.

One of the project requirements is to ensure that business application performance is guaranteed.

Which of the following would be the best approach for guest configuration?

A. Configure the virtual guest with a reservation, as specified, as the minimum requirement for the

application to run.

B. Configure the virtual guest with a reservation, as specified, as the projected initial workload

requirement.

Answer: B

Explanation:

Allocated resources are shown in the guest operating system and are not guaranteed. The amount

depends on the unreserved resources available at the time. Assuming no functionality issues, you

can configure a production application to be guaranteed its projected workload, and the system

should deliver. Without a reservation, there is potential for a performance impact if there is

contention.




NO.8 Auto Deploy can be used with _______________.

A. The VCSA only

B. the Windows version of the vCenter only

C. both versions of the vCenter

Answer: C

Explanation:

The Auto Deploy feature is an excellent design choice for managing a mass installation of ESXi. The

vCenter is required for implementation; however, the requirement is independent of vCenter

version.




Posted 2014/8/29 9:08:38  |  Category: VMware  |  Tag: VCAP5-DCD자료