Pass4Test의 SAP Application Associate C_TSCM42_66시험덤프는 실제시험의 기출문제와 예상문제를 묶어둔 공부자료로서 시험문제커버율이 상당히 높습니다.IT업계에 계속 종사하려는 IT인사들은 부단히 유력한 자격증을 취득하고 자신의 자리를 보존해야 합니다. Pass4Test의 SAP Application Associate C_TSCM42_66시험덤프로 어려운 SAP Application Associate C_TSCM42_66시험을 쉽게 패스해보세요. IT자격증 취득이 여느때보다 여느일보다 쉬워져 자격증을 많이 따는 꿈을 실현해드립니다.
NO.1 Which objects can affect the calculation of capacity requirements for an operation?(Choose
three)
A. Standard values (routing)
B. In-house production time (material master)
C. Transport time (routing)
D. Formulas (work center)
E. Operation control key (routing)
Answer: A,D,E
NO.2 Which of the following master data can be used with process orders?(Choose three)
A. Serial numbers
B. Master recipes
C. Resources
D. Production/resource tools
E. Production versions
Answer: B,C,E
NO.3 The final assembly of a finished product should only be triggered when a customer order
arrives.
Which planning strategy for the finished product do you use?
A. Planning with make-to-stock (strategy 10)
B. Planning at the assembly level (strategy 70)
C. Planning without final assembly (strategy 50)
D. Planning with final assembly (strategy 40)
Answer: C
NO.4 Which types of objects can be changed with Engineering Change Management (ECM)?(Choose
three)
A. Task list
B. Work center
C. Production version
D. Bill of material
E. Material master
Answer: A,D,E
NO.5 Which activity can trigger an automatic availability check for the components of a production
order?
A. Material staging
B. Order rescheduling
C. Order release
D. Goods receipt for a missing part
Answer: C
NO.6 You want to use the different options for planning in SAP ECC.
What is the correct sequence of the planning procedures?
A. Sales and operations planning -> Demand management -> Long-term planning -> Material
requirements planning -> Capacity planning
B. Demand management -> Sales and operations planning -> Capacity planning -> Long-term
planning -> Material requirements planning
C. Material requirements planning -> Demand management -> Sales and operations planning ->
Long-term planning -> Capacity planning
D. Long-term planning -> Sales and operations planning -> Demand management -> Material
requirements planning -> Capacity planning
Answer: A
NO.7 You want to enhance the system statuses of a production order with user statuses.
How do you do this?
A. Define the user statuses in the order type-dependent parameters.
B. Define a status profile in Customizing and assign it to the production scheduling profile.
C. Define a status profile in Customizing and assign it to the order type.
D. Define the user statuses in the Customizing table of the system statuses.
Answer: C
NO.8 You want to use the function "Read PP master data" in the production order.
However, while calling the function you receive an error message.
What could be the reason?
A. The material availability check has been performed.
B. Goods movements have been posted.
C. The production order has been released.
D. Order papers have been printed.
Answer: B
NO.9 Which of the following scheduling types can only be used in capacity planning?
A. Midpoint
B. Forward
C. Only capacity requirements
D. Backward
Answer: A
NO.10 In the Customizing for requirements planning, a project team notices that the alternatives P1,
P2, P3 and P4 are also delivered as standard in addition to MRP type PD. The number in each of
these alternatives represents a firming type.
What does a firming type define?(Choose two)
A. Handling existing procurement proposals outside the planning time fence.
B. Handling existing procurement proposals within a planning time fence.
C. Handling new requirements within the planning time fence.
D. Handling new procurement proposals that need to be created due to new requirements within
the planning time fence.
Answer: B,D