Pass4Test의 SAP Application Associate C_TSCM42_65덤프를 구매하시고 공부하시면 밝은 미래를 예약한것과 같습니다. Pass4Test의 SAP Application Associate C_TSCM42_65덤프는 고객님이 시험에서 통과하여 중요한 IT인증자격증을 취득하게끔 도와드립니다. IT인증자격증은 국제적으로 인정받기에 취직이나 승진 혹은 이직에 힘을 가해드립니다. 학원공부나 다른 시험자료가 필요없이 Pass4Test의 SAP Application Associate C_TSCM42_65덤프만 공부하시면 SAP Application Associate C_TSCM42_65시험을 패스하여 자격증을 취득할수 있습니다.
NO.1 What sequence do you follow in master data maintenance to define the production of a
material?
A. Create BOM -> Create work centers -> Create routing -> Carry out component assignment in BOM
or routing
B. Create BOM -> Create work centers -> Create routing -> Carry out component assignment in work
center
C. Create routing -> Create work centers -> Create BOM -> Carry out component assignment in BOM
or routing
D. Create work centers -> Create routing -> Create BOM -> Carry out component assignment in work
center
Answer: A
NO.2 For which of the following objects can you enter a confirmation? (Choose two)
A. Production order
B. Production order operation
C. Trigger Point
D. Work Center
Answer: A,B
NO.3 Which functions can be triggered before releasing a production order? (Choose three)
A. Confirmation
B. Selection of a routing
C. Scheduling
D. Stock determination
E. Selection of a BOM
Answer: B,C,E
NO.4 What is a feature of the simu-lation mode for material requirements planning in SAP ECC?
A. It posts planning results to the database automatically.
B. It propagates exception messages from a component to the finished product.
C. It calculates the delay time which may occur in planning.
D. It triggers multilevel bottom-up scheduling.
Answer: C
NO.5 What does SAP ERP mean?
A. SAP ERP is a planning system in which extended planning processes can be mapped.
B. SAP ERP is a system hardware that includes modules for purchasing, sales and distribution,
materials management, production and so on.
C. SAP ERP is a technological platform, on the basis of which customer-specific extensions can be
imported.
D. SAP ERP is an application that an enterprise can use to manage its business processes efficiently.
Answer: D
NO.6 Where can you define the valid receivers for production order costs?
A. In the valuation variant
B. In the production scheduling profile
C. In the settlement profile
D. In the costing variant
Answer: C
NO.7 Which of the following statements about consumption are correct? (Choose two)
A. Consumption takes place on the material level between the planned independent requirements
and the planned orders.
B. Consumption parameters (consumption mode and consumption interval) can be set in the
material master or in the MRP group.
C. Consumption is restructured with the planning run.
D. Consumption can take place between order reservations and planned independent requirements,
depending on the strategy.
Answer: B,D
NO.8 What features related to process orders can be used to fulfill Good Manufacturing Practices
(GMP) requirements? (Choose three)
A. Availability check
B. Digital signature
C. Resource selection
D. Electronic batch record
E. Approved master recipes
Answer: B,D,E
NO.9 When analyzing the SAP ECC order report for a planned order for a finished product, you
discover that one of the assemblies will not be available in time for the scheduled final assembly
because of automatic forward scheduling.
Which planning procedure do you use to create a feasible production plan from a requirements
planning perspective?
A. Interactive single-item planning for the delayed assembly
B. Multi-level single-item planning with the "simulation mode" option
C. Total planning online
D. Multi-level single-item planning with the "display material list" option
Answer: B
NO.10 Which of the following functions does SAP Supply Chain Management (SCM) offer?
A. Planning and optimization of supply chains across company boundaries.
B. Optimization of the procurement strategy with the supplier pool.
C. Product development, safety, quality, and maintenance.
D. Communication to customers through different interaction channels.
Answer: A