IT인증,IT자격증,IT자격증시험,IT인증시험

http://www.pass4test.net/

Microsoft Dynamics AX 2012 MB6-703인증자료

Microsoft Dynamics AX 2012 MB6-703시험은 국제적으로 승인해주는 IT인증시험의 한과목입니다. 근 몇년간 IT인사들에게 최고의 인기를 누리고 있는 과목으로서 그 난이도 또한 높습니다. 자격증을 취득하여 직장에서 혹은 IT업계에서 자시만의 위치를 찾으련다면 자격증 취득이 필수입니다.  Microsoft Dynamics AX 2012 MB6-703시험을 패스하고 싶은 분들은 Pass4Test제품으로 가보세요.

 

Who should take this exam?

Individuals wishing to obtain a certification on Microsoft Dynamics AX 2012 R3 Trade and Logistics should take this exam. This audience typically includes product designers, store managers, sales and purchase managers, salespeople, purchasers, and other people responsible for bill of materials (BOM) setup and administration, trade and logistics, inventory and warehouse management, and product information management.

 

NO.1 You plan to start using product change cases.
You need to identify what must be configured before you can create a new product change case.
What should you identify?
A. Case processes
B. Knowledge articles
C. Case workflows
D. Case categories
Answer: D

NO.2 You need to create a new automatic charge.
You open the Auto charges form and you create a new line.
Which field requires a value?
A. Charges code
B. Item charge group
C. Charges value
D. Vendor charges group
Answer: A

NO.3 You need to ensure that when a certain item is received, the item is quarantined automatically.
What should you configure?
A. Astorage dimension group
B. An item model group
C. Atracking dimension group
D. An item group
Answer: C

NO.4 You need to identify during which status update the inventory of quarantined orders is
returned to its original location.
Which status update should you identify?
A. Reported as finished
B. Ended
C. Released
D. Received
Answer: D

NO.5 You need to identify what can be done from the Arrival overview form.
What should you identify?
A. Estimating and managing item arrival alerts
B. Viewing expected receipts and starting the receipt process
C. Registering items that are delivered to a transfer warehouse
D. Checking that ordered items arrived physically in a quarantine warehouse
Answer: B

NO.6 You need to derive the sales price of an item while calculating a bill of materials (BOM).
Which settings should you configure?
A. Profit setting
B. Calculation group
C. Item purchase price
D. Cost group
Answer: D

NO.7 You have a bill of materials (BOM) item. All lines of the BOM item use a constant scrap amount
and a variable consumption. You identify that when you have a production run of 100 items, the
scrap cost is 10 US dollars and the unit cost is one US dollar.
You need to identify what will be the cost in the BOM calculation when you increase the size of
production to 200 units.
Which cost should you identify?
A. 2,100 US dollars
B. 210 US dollars
C. 220 US dollars
D. 2,200 US dollars
Answer: A

NO.8 You need to ensure that a shipment from a vendor can be accepted into inventory, even if the
quantity of the product received is greater than the amount ordered.
What should you configure?
A. Me inventory and warehouse management parameters
B. The procurement and sourcing parameters
C. The product Information management parameters
D. The accounts payable parameters
Answer: C

Posted 2015/3/13 13:14:12  |  Category: Microsoft  |  Tag: MB6-703인증자료