저희는 수많은 IT자격증시험에 도전해보려 하는 IT인사들께 편리를 가져다 드리기 위해 ISQI Certifications IREB-IT-CQ03실제시험 출제유형에 근거하여 가장 퍼펙트한 시험공부가이드를 출시하였습니다. 많은 사이트에서 판매하고 있는 시험자료보다 출중한 Pass4Test의 ISQI Certifications IREB-IT-CQ03덤프는 실제시험의 거의 모든 문제를 적중하여 고득점으로 시험에서 한방에 패스하도록 해드립니다. ISQI Certifications IREB-IT-CQ03시험은 Pass4Test제품으로 간편하게 도전해보시면 후회없을 것입니다.
NO.1 Which two statements are correct with regard to the introduction of a
requirements
engineering tool? (2 Points)
A. The introduction of a tool
defines the future requirements engineering approach
B. Risks associated with
the introduction can be identified through a pilot operation
C. The
requirements engineering processes must be clearly defined before
introduction
D. The license costs are generally the greatest cost block
relating to the introduction of a
requirements engineering tool
Answer:
C,D
NO.2 Requirements elicitation: Your company has received a customer
contract to develop a system
for the scheduling of the customer's delivery
vans.
It is your task to identify the requirements for this scheduling
system. You have arranged
appointments for interviews with three key members
of the customer's staff, and are now preparing
interview questions.
Which
of the questions below are appropriate interview questions for the requirements
elicitation?
(2 Points)
A. What are the most important technical terms for
the application and how are they defined?
B. If the delivery deadline is not
met, is a contract penalty to be paid?
C. What data quantities / data rates
are to be processed?
D. When is the installation of the completed system to
be started?
Answer: C
NO.3 For an interview, you have prepared a use
case diagram for the system to be specified. You
decide to talk through a use
case in detail with the stakeholder. You receive very useful feedback
which
must now be documented. Which of the following means of expression is least
suitable to
document the details of a single use case? (1 Point)
A. State
diagram
B. Activity diagram
C. Natural language
D. Context
diagram
E. Class diagram
Answer: D
NO.4 Which sentence best
characterises the term "stakeholder"? (1 Point)
A. The external actors
interacting with a system and the technical interfaces to surrounding
systems
are designated as stakeholders.
B. Stakeholders are persons and
organisations affected by the development and the use of the
system or of the
product.
C. Stakeholders are special interest representatives who are
responsible for the approval of the first
project phase.
D. A stakeholder
is responsible for the administration of the software development
environment.
Answer: B
NO.5 CORRECT TEXT
You have been commissioned
to analyze a change request for its possible impact. Which of the
following
aspects must be analyzed for this? (2 Points)
Answer: B,C,E,G
NO.6 As
part of the "UniKasso" project, the "CRETIL" company is standardising the
payment
methods for all customers. The requirements specification has been
created and the first release is
currently being implemented.
This week,
the management has decided to include the implementation of the "credit card"
mode of
payment in the first release and to shift the "direct debit" mode of
payment to the second release.
The test manager receives the order to adjust
the test planning accordingly.
Which particular characteristic of the
requirements will facilitate the work of the test manager
significantly in
this respect? (1 Point)
A. Coherence
B. Testability
C.
Flexibility
D. Stability
E. Traceability
Answer: E
requirements
engineering tool? (2 Points)
A. The introduction of a tool
defines the future requirements engineering approach
B. Risks associated with
the introduction can be identified through a pilot operation
C. The
requirements engineering processes must be clearly defined before
introduction
D. The license costs are generally the greatest cost block
relating to the introduction of a
requirements engineering tool
Answer:
C,D
NO.2 Requirements elicitation: Your company has received a customer
contract to develop a system
for the scheduling of the customer's delivery
vans.
It is your task to identify the requirements for this scheduling
system. You have arranged
appointments for interviews with three key members
of the customer's staff, and are now preparing
interview questions.
Which
of the questions below are appropriate interview questions for the requirements
elicitation?
(2 Points)
A. What are the most important technical terms for
the application and how are they defined?
B. If the delivery deadline is not
met, is a contract penalty to be paid?
C. What data quantities / data rates
are to be processed?
D. When is the installation of the completed system to
be started?
Answer: C
NO.3 For an interview, you have prepared a use
case diagram for the system to be specified. You
decide to talk through a use
case in detail with the stakeholder. You receive very useful feedback
which
must now be documented. Which of the following means of expression is least
suitable to
document the details of a single use case? (1 Point)
A. State
diagram
B. Activity diagram
C. Natural language
D. Context
diagram
E. Class diagram
Answer: D
NO.4 Which sentence best
characterises the term "stakeholder"? (1 Point)
A. The external actors
interacting with a system and the technical interfaces to surrounding
systems
are designated as stakeholders.
B. Stakeholders are persons and
organisations affected by the development and the use of the
system or of the
product.
C. Stakeholders are special interest representatives who are
responsible for the approval of the first
project phase.
D. A stakeholder
is responsible for the administration of the software development
environment.
Answer: B
NO.5 CORRECT TEXT
You have been commissioned
to analyze a change request for its possible impact. Which of the
following
aspects must be analyzed for this? (2 Points)
Answer: B,C,E,G
NO.6 As
part of the "UniKasso" project, the "CRETIL" company is standardising the
payment
methods for all customers. The requirements specification has been
created and the first release is
currently being implemented.
This week,
the management has decided to include the implementation of the "credit card"
mode of
payment in the first release and to shift the "direct debit" mode of
payment to the second release.
The test manager receives the order to adjust
the test planning accordingly.
Which particular characteristic of the
requirements will facilitate the work of the test manager
significantly in
this respect? (1 Point)
A. Coherence
B. Testability
C.
Flexibility
D. Stability
E. Traceability
Answer: E