IT인증,IT자격증,IT자격증시험,IT인증시험

http://www.pass4test.net/

SAP Application Associate C_TSCM42_66최신덤프공부




경쟁이 이토록 치열한 IT업계에서  SAP Application Associate C_TSCM42_66시험합격만으로 운명을 개변할수 있습니다. SAP Application Associate C_TSCM42_66인증시험은 국제적으로 유명한 인기시험으로 자신의 위치를 보장하는데 중요한 역할을 할수 있습니다.pass4test에서 연구제작한  SAP Application Associate C_TSCM42_66고품질 덤프로 시험대비를 하시면 시험합격은 물론이고 많은 공부를 할수 있습니다. 시험탈락시 불합격성적표로 덤프비용환불신청 가능하기에 안심하시고 시험준비를 하시면 됩니다.




NO.1 You want to use the function "Read PP master data" in the production
order.

However, while calling the function you receive an error
message.

What could be the reason?

A. The material availability check has
been performed.

B. Goods movements have been posted.

C. The production
order has been released.

D. Order papers have been printed.

Answer:
B



NO.2 Which types of objects can be changed with Engineering Change
Management (ECM)?(Choose

three)

A. Task list

B. Work center

C.
Production version

D. Bill of material

E. Material master

Answer:
A,D,E



NO.3 Which of the following scheduling types can only be used in
capacity planning?

A. Midpoint

B. Forward

C. Only capacity
requirements

D. Backward

Answer: A



NO.4 You want to enhance the
system statuses of a production order with user statuses.

How do you do
this?

A. Define the user statuses in the order type-dependent
parameters.

B. Define a status profile in Customizing and assign it to the
production scheduling profile.

C. Define a status profile in Customizing and
assign it to the order type.

D. Define the user statuses in the Customizing
table of the system statuses.

Answer: C



NO.5 The final assembly of a
finished product should only be triggered when a customer
order

arrives.

Which planning strategy for the finished product do you
use?

A. Planning with make-to-stock (strategy 10)

B. Planning at the
assembly level (strategy 70)

C. Planning without final assembly (strategy
50)

D. Planning with final assembly (strategy 40)

Answer: C



NO.6
Which objects can affect the calculation of capacity requirements for an
operation?(Choose

three)

A. Standard values (routing)

B. In-house
production time (material master)

C. Transport time (routing)

D. Formulas
(work center)

E. Operation control key (routing)

Answer: A,D,E



NO.7
In the Customizing for requirements planning, a project team notices that the
alternatives P1,

P2, P3 and P4 are also delivered as standard in addition to
MRP type PD. The number in each of

these alternatives represents a firming
type.

What does a firming type define?(Choose two)

A. Handling existing
procurement proposals outside the planning time fence.

B. Handling existing
procurement proposals within a planning time fence.

C. Handling new
requirements within the planning time fence.

D. Handling new procurement
proposals that need to be created due to new requirements within

the planning
time fence.

Answer: B,D



NO.8 Which activity can trigger an automatic
availability check for the components of a production

order?

A. Material
staging

B. Order rescheduling

C. Order release

D. Goods receipt for a
missing part

Answer: C



Posted 2014/8/6 10:36:09  |  Category: SAP  |  Tag: C_TSCM42_66최신덤프공부