NO.1 How can a developer customize the reporting period so that the year has 52 weeks,

with 7 days in each

week, yielding 364 days?

A. Set up a lunar time period.

B. Set up a time period based on a calendar year.

C. Set up a time period based on fiscal year.

D. Set up a relative time category.

Answer: A


NO.2 If a cube group based on a level in a dimension is created, how can the developer

prevent another cube

from being added to the cube group?

A. Ensure the level labels and category labels remain unchanged.

B. Specify a category limit for the level.

C. Prevent the automatic creation of categories.

D. Exclude the dimension from auto-partitioning.

Answer: C


NO.3 What must be done to make the cube data available in Analysis Studio?

A. Use the PowerCube Connection Utility to publish the cube.

B. Create a data source connection to the cube in Transformer.

C. Publish the PowerCube as a data source and a package.

D. Generate a package that contains a data source connection to the cube.

Answer: C


NO.4 What can be done to correct a report that contains time categories that are out of range

and irrelevant

to the user?

A. Ensure the input format is correct for dates in the source data.

B. Check to see if an absolute range category is automatically generated.

C. Adjust the acceptable dates included in the model.

D. Create a non-standard time dimension.

Answer: C


NO.5 Senior Managers need to see total and regional sales figures, but Regional Managers

should see

relevant figures for only their regions. Where can the developer specify the degree of detail to

be

included?

A. In a manual level

B. In a cube group

C. In the PowerCube

D. In a scenario dimension

Answer: B


NO.6 Where can a developer change relationships to create a structure different from what

the data

suggests.?

A. Categories Diagram

B. Dimension Map

C. Data source property sheet

D. Level property sheet

Answer: A


NO.7 What can be done if a regular time dimension is added to a model, and the levels Year,

Quarter, and

Month are not automatically generated?

A. Set the date input format for the time dimension.

B. Set the data class of the source category to Date.

C. Change the numeric time sequence for each level.

D. Create a non-standard time dimension with the new levels.

Answer: B


NO.8 How can a developer populate a level with a different data source column?

A. Through level properties.

B. Through column properties.

C. Through data source properties.

D. Through data source scope.

Answer: A

 