IT인증,IT자격증,IT자격증시험,IT인증시험

http://www.pass4test.net/

IBM C2020-002최신덤프

IT업계에 종사하고 계시나요? 최근 유행하는  IBM C2020-002 (IBM Algo Financial Modeler Developer Fundamentals)  IT인증시험에 도전해볼 생각은 없으신지요? IT 인증자격증 취득 의향이 있으시면 저희. Pass4Test의 IBM C2020-002 (IBM Algo Financial Modeler Developer Fundamentals) 덤프로 시험을 준비하시면 100%시험통과 가능합니다.  Pass4Test의 IBM C2020-002 (IBM Algo Financial Modeler Developer Fundamentals) 덤프는 착한 가격에 고품질을 지닌 최고,최신의 버전입니다. Pass4Test덤프로 가볼가요?

 

NO.1 Which three properties would be set for a layer in a model? (Choose three.)

A. Step length

B. Portfolio Date

C. Layer End Date

D. Model name

E. Layer name

Answer: A,C,E

 

NO.2 How would you make a model built in AlgoFinancial Modeler stochastic?

A. Add a stochastic process to a module.

B. Add a stochastic process to a layer in the model.

C. Add a stochastic process to a data process.

D. Add a stochastic process to an assumption set.

Answer: B

 

NO.3 In a model, to what would you attach an assumption set?

A. A data view

B. A module

C. Alayer

D. A projection process

Answer: C

 

NO.4 A client has redesigned their nonprofit endowment product to pay a guaranteed 110% of Sum

Assured on death rather than just the Sum Assured assumed in Standard Code. They want you to

update the model so that it will be unaffected when any future updates of Standard Code are

copied into the workspace.

How would you do this?

A. Change the existing formula to 110%* Sum Assured.

B. Comment out the original code within the existing module and replace with 110% * Sum Assured.

C. Copy the Sum Assured variable into a blank line at the bottom of theproduct and change the code

to 110% * Sum Assured.

D. Copy the Sum Assured variable into a blank line at the bottom of the module and change the

code to 110% it Sum Assured.

Answer: A

 

NO.5 If no suffix is attached to a portfolio variable in an event variable is formula, then which value

is used?

A. The value at the end of the step

B. The value at the previous event regardless of type

C. The value at the previous event of the same type

D. The value at the start of the step

Answer: D

 

NO.6 Click the Exhibit button.

The arrow in the exhibit points to something missing in the AFM Output function. What is missing?

A. Filter_Name

B. Event Name

C. Module_Name

D. Program_Name

Answer: D

 

NO.7 Which three would you attach to a program on a projection process inside a layer? (Choose

three.)

A. An assumption set

B. A data process

C. An aggregation report

D. A category

E. A module

Answer: A,C,D

 

NO.8 What is the role of modules in AEM?

A. Modules are components used to specify all data variables that are being passed in from an

external source.

B. Modules are sets of variables and events for carrying out calculations in Algo Financial Modeler.

C. Modules provide a diagrammatic view of a company structure that can be visualized within Algo

Financial modeler.

D. Modules containing all the components needed to complete a set of calculations in Algo Financial

Modeler are combined.

Answer: B

 

Posted 2014/5/13 14:00:24  |  Category: IBM  |  Tag: C2020-002최신덤프