IT인증,IT자격증,IT자격증시험,IT인증시험

http://www.pass4test.net/

IBM A2180-189 덤프공부

연구결과에 의하면 IBM Certified BPM Analyst A2180-189시험은 너무 어려워 시험패스율이 낮다고 합니다. Pass4Test의 IBM Certified BPM Analyst A2180-189덤프와 만나면IBM Certified BPM Analyst A2180-189시험에 두려움을 느끼지 않으셔도 됩니다. Pass4Test의 IBM Certified BPM Analyst A2180-189덤프는 엘리트한 IT전문가들이 실제시험을 연구하여 정리해둔 퍼펙트한 시험대비 공부자료입니다. 저희 덤프만 공부하시면 시간도 절약하고 가격도 친근하며 시험준비로 인한 여러방면의 스트레스를 적게 받아 IBM Certified BPM Analyst A2180-189시험패스가 한결 쉬워집니다.

 

NO.1 A company needs to improve their hiring process and hired a BPM analyst to map the current

state. What is the first thing the BPM analyst should do while constructing a discovery map? Identify

the:

A. Value-Add activities.

B. sub processes within the hiring process.

C. start and end points of the hiring process.

D. activity where the maximum problems lie.

Answer: C

 

NO.2 A company needs to improve their hiring process and hired a BPM analyst to map the current

state. During the process discovery session, the team identifies that the process steps to review the

"hiring" request is the same as the process steps to review a "promotion/pay rise" request. What

should the BPM analyst use to map the activities needed for the review of the "hiring" request in

Blueworks Live?

A. a sub-process

B. a different color

C. a linked process

D. a separate milestone

Answer: C

 

NO.3 A company needs to improve their hiring process and hired a BPM analyst to map the current

state. During the discovery session, the business subject matter experts (SMEs) indicate to the BPM

analyst that the hiring request is reviewed by both the human resource admin and the human

resource manager. How should the BPM analyst document the participant role for this activity?

A. Assign the admin as the participant since the admin is paid less.

B. Assign the manager as the participant since the admin reports to the manager.

C. Break the "Review" task into separate tasks and define who does what.

D. Pick either the admin or the manager and assign the "Review" task to that role.

Answer: C

 

NO.4 During the Process Discovery phase, the BPM analyst needs to identify who must fully

participate in the Process Improvement and Discovery Workshops (PIDW). Of the many roles in a

BPM project, which roles must fully participate?

A. Process Owner, Subject Matter Expert

B. Technical Consultant, Process Owner, BPM Developer

C. Technical Consultant, Process Owner, Project Manager

D. Project Manager, Process Owner, Subject Matter Expert

Answer: A

 

NO.5 A BPM analyst is designing a process in the Process Diagram View, and realizes the process

must account for a technical exception following an activity. What symbol in the BlueWorks Live

needs to be used for this technical exception?

A. Option A

B. Option B

C. Option C

D. Option D

Answer: B

 

NO.6 A BPM analyst needs to make a change to the connections in the following process diagram.

The order of activities needs to be changed so that "Grind Beans" is followed by "Brew Coffee".

"Heat Milk" will come last after "Brew Coffee".

How should the BPM analyst make this change to the connection?

A. Click on the "Brew Coffee" activity and drag it onto the connection between "Grind Beans" and

"Heat Milk"

B. Click on the "Grind Beans" activity and drag it onto the connection between "Heat Milk" and

"Brew Coffee"

C. Click on the connection between "Heat Milk" and "Brew Coffee" and drag the connection arrow

to "Grind Beans"

D. Click on the connection between "Grind Beans" and "Heat Milk" and drag the connection arrow

to "Brew Coffee".

Answer: A

 

NO.7 A BPM analyst has modeled the following process. However, after the "Extract Data" and

"Send data use case template to client", the client has stated that "Complete data scenarios" should

be done.

How should the BPM analyst adjust the process?

A. Join A and B

B. Insert join before A, and move B after A

C. Insert Join before B, and move A after B

D. Move B before A, and insert a join after A

Answer: B

 

NO.8 A BPM analyst is creating a process model for requesting a renovation permit. The BPM

analyst is using the following description of the first activity:

"One of our municipal office clerks receives a paper permit application from the local resident, an

applicant. The clerk first looks up the resident's name and address in our system, then enters the

information from the paper application into the system, and assigns a temporary permit number to

the application. When the application entry is complete, the clerk sends it to a manager to assign it

to an adjudicator."

Which name should the BPM analyst use for the first task that accurately describes the activity and

follows recommended naming conventions?

A. Application Entry

B. Create Application

C. Clerk Receive and Enter Application

D. Lookup name, create application, assign number, and send it to the manager

Answer: B

 

 

Posted 2014/4/3 10:33:05  |  Category: IBM  |  Tag: A2180-189 덤프공부