Pass4Test에서는 Oracle 1Z0-550 (JD Edwards EnterpriseOne 9 Configurable Network Computing Essentials)시험대비덤프를 발췌하여 제공해드립니다. Oracle 1Z0-550 (JD Edwards EnterpriseOne 9 Configurable Network Computing Essentials)시험대비덤프에는 시험문제의 모든 예상문제와 시험유형이 포함되어있어 시험준비자료로서 가장 좋은 선택입니다. Pass4Test에서 제공해드리는 전면적인 Oracle 1Z0-550 (JD Edwards EnterpriseOne 9 Configurable Network Computing Essentials)시험대비덤프로 Oracle 1Z0-550 (JD Edwards EnterpriseOne 9 Configurable Network Computing Essentials)시험준비공부를 해보세요. 통과율이 100%입니다.
NO.1 Regardless of the platform choice, Work with Server Jobs is the key mechanism to review the status of
a UBE job that has been submitted to server. After a job has been submitted, which of the following
configuration option is NOT required for Object Management Workbench (OMW) to function an
administrator cannot do from Work with Server Jobs?
A. Print Jobs
B. Change Job Priority
C. View Logs for Job
D. Terminate Jobs
E. Resubmit a Job
Answer: B
NO.2 When deploying a Full Package to an Enterprise Server, what defines the location of the object
specifications to be used during runtime that the package deployment modifies?
A. The path code spec directory
B. The package spec directory
C. JDE.INI
D. OCM
E. The spec.ini file in the package spec directory
Answer: E
NO.3 Sever Manager provides a unified interface where administrators can view information regarding
EnterpriseOne. What are the three major functions of Server Manager?
A. Check the EnterpriseOne Server Installed Programs
B. Check the EnterpriseOne Server Configurations
C. Check the EnterpriseOne Server OS Patch level
D. Monitor the EnterpriseOne Server Process
E. Monitor the EnterpriseOne Server Task Manager
Answer: A,B,C
NO.4 EnterpriseOne subsystem UBE jobs provide the system the ability to run without interaction and to
avoid the fixed cost of repeated UBE startup overhead. Which of the options would make UBE a
good candidate for the subsystem?
A. Long running jobs
B. Short duration jobs
C. Process intensive jobs
D. Light-weight process jobs
E. High memory usage jobs
Answer: B
NO.5 ACME is about to upgrade their Development environment from ERP 8.0 to EnterpriseOne 9.00.
Which pre-upgrade task is NOT recommended by the EnterpriseOne Upgrade documentation?
A. Verify Media Object queue setting in P98MOQUE
B. Generate serialized objects for the development environment
C. Transfer production versions to prototype using UBE R9830512
D. Make sure all work in progress objects have been checked into the development environment
E. Check the modification and merge flags through the Specification Merge Selection application
Answer: D
NO.6 ACME has decided to begin their EnterPriseOne implementation using the Oracle VM Templates for
JDE. Which three types are available for immediate download and quick implementation via e delivery?
A. Enterprise Server
B. HTML Server
C. Portal Server
D. Deployment Server
E. Database Server
Answer: A,B,E
NO.7 ACME is working on setting up security for *PUBLIC, individual users, and roles. What security type
grants permission to run an application regardless of other security settings?
A. Application
B. Action
C. Exit
D. Exclusive Application
E. Tab
Answer: D
NO.8 What three object types are promoted via Object Management Workbench (OMW)?
A. UDCs
B. User Overrides
C. Data Dictionary Item
D. Favorites
E. Serialized Objects
Answer: A,B,C
NO.9 When selecting a Path Code Database as part of the EnterpriseOne Platform Pack installation, which
two get installed on the server.?
A. System/Foundation code
B. Path Code specifications and runtime libraries
C. Database scripts to create and load databases
D. Server Manager Agent
E. Path Code Databases - Central Objects, Business Data, ...
Answer: B,C
NO.10 What configuration option is NOT required for Object Management Workbench (OMW) to function?
A. Activity Rules
B. User Roles
C. Constants
D. Allowed Actions
E. Save Location
Answer: D