IT인증,IT자격증,IT자격증시험,IT인증시험

http://www.pass4test.net/

IBM Certified Specialist 000-122 시험대비덤프공부

IT인증자격증은 국제적으로 승인받는 자격증이기에 많이 취득해두시면 취업이나 승진이나 이직이나 모두 편해집니다. 다른 사람이 없는 자격증을 내가 가지고 있다는것은 실력을 증명해주는 수단입니다.  IBM Certified Specialist 000-122시험은 널리 승인받는 자격증의 시험과목입니다. IBM Certified Specialist 000-122덤프로  IBM Certified Specialist 000-122시험공부를 하시면 시험패스 난이도가 낮아지고 자격증 취득율이 높이 올라갑니다.자격증을 많이 취득하여 취업이나 승진의 문을 두드려 보시면 빈틈없이 닫힌 문도 활짝 열릴것입니다.

 

 

 

NO.1 A customer has two production IBM POWER7+ 750s in the same data center.
The customer has an application in an LPAR that needs to run 24x7.
What is required to allow the planned migration of that LPAR to the second system?
A. A shared Hardware Management Console One dedicated core on each Power 750
B. PowerVM Enterprise Edition on both systems SAN storage accessible to the VIO Servers on each
Power 750
C. Systems Director Enterprise Edition A common shared processor pool on each Power 750
D. PowerVM Standard Edition Dual system accessibility to virtual SCSI or virtual Fibre Channel
Answer: B

NO.2 What is a reason that POWER7 technology can provide higher throughput than Xeon x86
technology?
A. POWER7 supports more DIMM slots than x86.
B. POWER7 has higher redundancy of registers than x86.
C. POWER7 supports more virealization technologies than x86.
D. POWER7 supports 4 threads per core, while Xeon supports only 2.
Answer: D

NO.3 What is the benefit of using the Active Memory Expansion feature in Power Systems servers?
A. Memory capacity will virtually be doubled.
B. Memory will be disk-cached to improve performance.
C. Memory will be allocated to an LPARto improve performance.
D. Memory contents are compressed to allow for greater utilization.
Answer: D

NO.4 A prospective customer is running a database application that cannot be upgraded.
They plan to replace it with a DB2-based server environment that can scale in the future.
The prospect has asked why anyone would choose Power Systems servers when Intel-based servers
cost less.
Which of the following is an effective response?
A. DB2 on Power Systems delivers more than ten times the throughput per core than on Intel due to
exploitation of SMT.
B. Core for core, Intel-based servers have more expensive DB2 software licensing costs when
compared to PowerSystems.
C. Power Systems servers offer a lower TCO due to greater processor power, virealization
technologies and bothhorizontal and vertical growth.
D. Power Systems servers offer superiority in energy-management technologies and use
dramatically less energy whilegenerating much less heat.
Answer: C

NO.5 A customer is moving a small application from an existing POWER7 server to a new system in a
new location.
They will be moving an existing 12X I/O drawer to the new server
Which of the following configuration will support a 12X PCI-X expansion drawer?
A. A4-corePower710
B. A 4-core Power 720
C. A 6-core Power 730
D. A 6-core Power 720
Answer: D

NO.6 What is a unique RAS characteristic of Power Systems Enterprise servers compared to Power
Systems Express servers?
A. Dynamic Processor Sparing
B. Dynamic Processor Deallocation
C. Dynamic Processor Error Recovery
D. Dynamic Service Processor Failover
Answer: D

NO.7 Which of the following Power Systems design functions allows the system to identify
situations which can result in a system outage?
A. Light Path Diagnostics
B. Electronic Service Agent
C. First Failure Data Capture
D. Alternate Processor Recovery
Answer: C

NO.8 An environment for a popular ISV application used on Power Systems must be sized.
Which IBM tool or resource should be used?
A. Techline
B. eConfigurator
C. Facts and Features
D. System Planning Tool
Answer: A

NO.9 When moving an HP-UX based application workload from an HP Superdome onto a Power
Systems server, which operating system will provide the easiest transition'?
A. AIX
B. IBMi
C. Red Hat Enterprise Linux
D. SuSe Linux Enterprise Server
Answer: A

NO.10 What energy capability of Power Systems can be used in data centers to restrict server energy
consumption, especially in cases where the data center might be nearing the limit of the energy it
can provide?
A. Power Capping
B. EnergyScale for I/O
C. Processor Core Nap
D. Dynamic Power Saver
Answer: A
 
Posted 2013/9/26 6:25:16  |  Category: 미분류  |  Tag: