IBM certifications III 000-977 시험을 패스해서 자격증을 취득하려고 하는데 시험비며 학원비며 공부자료비며 비용이 만만치 않다구요? 제일 저렴한 가격으로 제일 효과좋은 Pass4Test 의 IBM certificatio ns III 000-977 덤프를 알고 계시는지요? Pass4Test 의 IBM certifications III 000-977 덤프는 최신 시험문제에 근거하여 만들어진 시험준비공부가이드로서 학원공부 필요없이 덤프공부만으로도 시험을 한방에 패스할수 있습니다. 덤프를 구매하신분은 철저한 구매후 서비스도 받을수 있습니다.
NO.1 The CIO has recommended that their system be upgraded to a more current Power Systems solution.
The existing lease has 9 months before it ends. What is the least expensive financing solution for the
client?
A. Add the upgrade to the remaining lease term.
B. Buy out the existing lease and finance the upgrade.
C. Buy out the existing lease and finance a new system.
D. Provide a 3 year base lease extension and finance the upgrade.
Answer: D
NO.2 A medium sized company acquired two smaller companies and now has many separate Linux-based
applications that must be integrated into a single IT department. They also have Sybase databases
running on Linux. What advantages would a Power Systems solution offer this customer?
A. PowerVM Lx86 provides an environment for Linux applications to run natively on a single Power
Systems server in a shared processor pool.
B. Micro-partitioning provides an environment to consolidate many Linux servers and offers significantly
better utilization of system resources.
C. General Parallel File System (GPFS) protects the customer investment by clustering with other Linux
systems to form a grid based architecture.
D. The Power Systems Linux Tool Kit recompiles Linux applications and databases onto AIX providing
cost-effective consolidation into Workload Partitions.
Answer: B
NO.3 An IT manager would like an explanation of why he should consider purchasing the UPS that is included
with other peripherals in a configuration for a Power 750. What function and benefit does the UPS in this
configuration provide?
A. A production server requires a UPS to provide uninterrupted electricity in the event of a long term
power outage.
B. A UPS can significantly reduce energy usage on POWER7 servers when managed by Systems
Director and Active Energy Manager.
C. Using a UPS specifically designed for Power Systems reduces energy consumption and significantly
extends the life of the system.
D. The UPS will help protect assets by detecting electrical utility anomalies and providing power for a
limited period of time, when required.
Answer: D
NO.4 Which of the following describes a benefit of TurboCore?
A. Increases the system bandwidth
B. Increases the speed of the core
C. Increases L2 cache available per chip
D. Increases the threads per core from 4 to 8
Answer: B
NO.5 A customer is running an Oracle database on a 16-core POWER5 570 and wants to migrate to a Power
750. Processing requirements have remained stable. How can the sales representative help to justify the
purchase?
A. Active Energy Manager found in the Power 750 firmware lowers energy cost.
B. The Power 750 requires fewer cores to run the Oracle database, lowering software costs.
C. The ability to concurrently replace cores and memory on the Power 750 reduces the cost of disrupted
service.
D. The Power 750 has better virtualization features than the POWER5 570, increasing the utilization of
the system.
Answer: C
NO.6 A company with limited budget has a requirement for sixteen POWER7 cores to implement an
application. Plans for future applications require the system to scale to 24 cores. Which system addresses
the current and future customer needs at least cost?
A. Power 740
B. Power 750
C. Power 770
D. Power 780
Answer: B
NO.7 The IT manager has asked for assistance in building a proposal to consolidate their Sun servers running
WebSphere to an existing Power 570. The CFO has received a proposal for an HP blade solution to
replace the Sun servers. What is the correct approach?
A. Request a meeting with the IT manager and CFO
B. Provide IBM customer references and white papers
C. Propose a POWER7 solution with multiple partitions
D. Provide IBM Global Services and financing for the HP solution
Answer: A
NO.8 A Power Systems user has been notified by the local utility company that the amount of supplied
energy is at its limit. The company is expanding and needs to add new applications. In addition to
consolidating applications on to fewer servers, what can a Power sales representative offer to help the
customer?
A. VMControl to cap application energy usage
B. IBM i 7 or AIX 7's energy management features
C. Systems Director to manage server energy consumption
D. Active Energy Manager to manage the server energy usage
Answer: D
NO.9 How is RAS implemented in IBM Power Systems?
A. IBM implements RAS functionality into the supported operating systems to eliminate hardware errors.
B. IBM uses a design process that incorporates RAS into every facet of system design and
manufacturing.
C. IBM leverages relationships with industry leading suppliers of high-end components and electronics to
improve RAS.
D. IBM involves independent organizations to conduct industry standard tests and benchmarks and
provide guidance on RAS quality.
Answer: B
NO.10 What is the most important factor when creating an executive summary?
A. Avoid technical jargon
B. Summarize the implementation plan
C. Avoid restating the customer goals
D. Include a copy of the detailed configuration
Answer: A
NO.11 A Power 770 configuration has 24 active cores with 8 on-demand. During a design review, the customer
was uncertain if 24 cores would support daily performance requirements. How can the customer
determine if they have sufficient cores without unnecessary purchases?
A. Use Utility CoD to activate the on-demand cores.
B. Use the Trial CUoD to activate the on-demand cores.
C. Activate the TurboCore feature to maximize core performance.
D. Use PowerVM's ability to automatically activate the on-demand cores as needed.
Answer: B
NO.12 IBM Systems Director Enterprise Edition addresses which customer pain points?
A. Energy monitoring
B. Maintaining security settings
C. Automating storage management
D. Disaster Recovery synchronization
Answer: A
NO.13 A customer has a 2-core POWER5 server, thirty x86-based Linux servers, and 10TB of storage. They
have budget approval for a complete infrastructure refresh, including a disaster recovery system.
Which solution supports the customer needs at lowest cost.?
A. Blade servers with DS5000
B. Power 770 servers with DS8000
C. Power 730 servers with DS5000
D. Power 755 servers with DS6000
Answer: C
NO.14 A data center manager is concerned about server sprawl and floor space, and the company has
decided on a Blade strategy. The customer application needs at least 12 cores per server. An additional 3
servers will be added in the next 12 months. Which of the following Blade solutions address current and
future requirements?
A. JS43
B. JS23
C. PS702
D. PS701
Answer: C
NO.15 A client needs a solution which provides a quick and easy way to deploy firmware patches, receive
notifications of hardware component failures, disk and CPU thresholds, and operating system patch
levels. Which offering will support the customer requirement?
A. IBM PowerVM Enterprise Edition
B. IBM Systems Director Express Edition
C. IBM Tivoli Monitoring Express Edition
D. IBM Performance Manager for Power Systems
Answer: B