Pass4Test는 저희 제품을 구매한 분들이 100%통과율을 보장해드리도록 최선을 다하고 있습니다. Pass4Test를 선택한것은 시험패스와 자격증취득을 예약한것과 같습니다. Pass4Test의 믿음직한 EXIN EX0-113 (TMap Next Foundation)덤프를 공부해보세요.
NO.1 In which Map phase activity does the pre-test take place?
A. Defining central starting points
B. Intake of the test object
C. Specifying the test object intake
D. Executing (re)tests
Answer: B
NO.2 What is not an advantage of applying a test design technique and recording it in the test specifications?
A. that the tests are reproducible
B. that the test specifications are transferable
C. that coverage of 100% is achieved
D. that it provides a justified elaboration of the test strategy
Answer: C
NO.3 Which defect has an internal cause that can be solved within the test team?
A. a defect in the test basis
B. a defect in the test specification
C. a defect in the test object
Answer: B
NO.4 Under which circumstance can Exploratory Testing be used effectively?
A. when experienced testers with domain knowledge are available
B. when testing must be as brief as possible on the critical path of the project
C. when critical functionality, failure of which can cause severe damage, must be tested
Answer: A
NO.5 See the definition below:
Tests in which the supplying party demonstrates that the product particularly meets the functional and
non-functional specifications and the technical design, among other things.
Of which test level is this the definition?
A. acceptance test
B. development test
C. system test
Answer: C
EXIN EX0-113 (TMap Next Foundation)시험덤프공부
Posted 2013/6/24 9:02:59 | Category: 미분류 | Tag: