IT인증,IT자격증,IT자격증시험,IT인증시험

http://www.pass4test.net/

EXIN EX0-113 덤프공부가이드

Pass4Test는 Pass4Test의 EXIN EX0-113 (TMap Next Foundation)  덤프자료를 공부하면 한방에 시험패스하는것을 굳게 약속드립니다. Pass4Test의  EXIN EX0-113 (TMap Next Foundation) 덤프로 공부하여 시험불합격받으면 바로 덤프비용전액 환불처리해드리는 서비스를 제공해드리기에 아무런 무담없는 시험준비공부를 할수 있습니다.





NO.1 In which Map phase activity does the pre-test take place?
A. Defining central starting points
B. Intake of the test object
C. Specifying the test object intake
D. Executing (re)tests
Answer: B

NO.2 Which defect has an internal cause that can be solved within the test team?
A. a defect in the test basis
B. a defect in the test specification
C. a defect in the test object
Answer: B

NO.3 What is not an advantage of applying a test design technique and recording it in the test specifications?
A. that the tests are reproducible
B. that the test specifications are transferable
C. that coverage of 100% is achieved
D. that it provides a justified elaboration of the test strategy
Answer: C

NO.4 See the definition below:
Tests in which the supplying party demonstrates that the product particularly meets the functional and
non-functional specifications and the technical design, among other things.
Of which test level is this the definition?
A. acceptance test
B. development test
C. system test
Answer: C

NO.5 Under which circumstance can Exploratory Testing be used effectively?
A. when experienced testers with domain knowledge are available
B. when testing must be as brief as possible on the critical path of the project
C. when critical functionality, failure of which can cause severe damage, must be tested
Answer: A
Posted 2013/6/24 8:50:23  |  Category: 미분류  |  Tag: