The certification test "SAP Certified Application Associate - Planning and GATP in SAP SCM APO 7.0 EhP1" verifies proven skills and fundamental knowledge in the area of the SAP SCM APO Planning and gATP. It proves that the candidate has a good overall understanding within this consultant profile, and can apply this knowledge practically in projects under guidance of an experienced consultant.
Pass4Test 에서 제공해드리는 SAP Application Associate C_TSCM44_65 시험덤프자료를 구입하시면 퍼펙트한 구매후 서비스를 약속드립니다. Pass4Test에서 제공해드리는 덤프는 IT업계 유명인사들이 자신들의 노하우와 경험을 토대로 하여 실제 출제되는 시험문제를 연구하여 제작한 최고품질의 덤프자료입니다. SAP Application Associate C_TSCM44_65 시험은 Pass4Test 표 SAP Application Associate C_TSCM44_65 덤프자료로 시험준비를 하시면 시험패스는 아주 간단하게 할수 있습니다. 구매하기전 PDF버전 무료샘플을 다운받아 공부하세요.
To ensure success, SAP recommends combining education courses and hands-on experience to prepare for your certification exam as questions will test your ability to apply the knowledge you have gained in training.
NO.1 A customer defines a variant for a production planning run and needs to
specify the planning
objects for the SAP_MRP_002 heuristic. They ask you for
the appropriate selection criteria.
Which of the following planning objects
do you recommend?
A. Resources
B. Operations
C. Products
D.
Orders
Answer: C
NO.2 In the context of external procurement, which of
the following master data objects are
transferred via CIF?
Note: There are
3 correct answers to this question.
A. Quota arrangement
B. Scheduling
agreement
C. Source list
D. Purchasing info record
E.
Contract
Answer: B,D,E
NO.3 Rounding in DP can be a problem because of
disaggregation.
How can you avoid large rounding errors?
Note: There are 2
correct answers to this question.
A. Use a unit of measure with decimal
values for the planning area and maintain unit conversion for
all
products.
B. Use only calculation type S (pro rata) for all key
figures.
C. Use a storage bucket profile with just one periodicity.
D.
Restrict the number of key figures to a reasonable amount.
E. Use only small
numbers in planning.
Answer: A,C
NO.4 How do you replace an old
product with a new one in DP?
Note: There are 2 correct answers to this
question.
A. Use GATP rules
B. Use realignment
C. Use form fit function
classes
D. Create an interchangeability group
E. Create a like
profile
Answer: A,E
NO.5 A customer in the soft drinks industry wants
to use promotions in DP.
If they plan a promotion for bottles, fewer cans
will be planned automatically.
What do you need to configure to plan such a
promotion?
Note: There are 3 correct answers to this question.
A. Set up
cannibalization groups.
B. Define the link between bottles and cans via
macros.
C. Set up a macro that adds the promotion value to final sales.
D.
Specify which characteristics can be used for promotions in the promotion
profile.
E. Set up a promotion key figure and assign it to the planning area
and characteristic.
Answer: A,C,E
NO.6 Which statements describe macro
capabilities for DP and SNP correctly?
Note: There are 3 correct answers to
this question.
A. You can use macros to control layout attributes of a data
view.
B. You create macros for the planning book rather than the data
view.
C. You define macros at 4 levels: macro, step, result, and
calculation.
D. You can generate your own alerts using macros.
E. You can
only execute macros interactively with the start, default, and exit
options.
Answer: A,C,D
NO.7 Which of the following is a valid function
of the internal BW?
A. It is only used to import historical data for DP.
Reporting is executed using the external BW.
B. It can be used to back up
planning results from liveCache to the database.
C. It is only used for DP.
SNP and PP/DS do not use the internal BW.
D. Planning results stored in
liveCache are automatically replicated to the database of the
internal
BW.
Answer: B
NO.8 What influence does the checking
horizon have for demands which cannot be confirmed in
time?
A. At the end
of the checking horizon, the total demand quantities can be automatically
confirmed.
B. Based on lot size procedure, the remaining quantity can be
confirmed after the dynamically
calculated checking horizon.
C. At the end
of the checking horizon, the remaining quantities have to be confirmed
manually.
D. At the end of the checking horizon, the remaining quantity
automatically creates a planned
receipt.
Answer: A