IBM Certified Deployment Professional C2080-471시험공부

Pass4Test는 여러분이  IBM Certified Deployment Professional C2080-471시험 패스와 추후사업에 모두 도움이 되겠습니다.Pass4Test제품을 선택함으로 여러분은 시간과 돈을 절약하는 일석이조의 득을 얻을수 있습니다.  IBM Certified Deployment Professional C2080-471인증시험패스는 아주 어렵습니다. 자기에 맞는 현명한 학습자료 선택은 성공의 지름길을 내딛는 첫발입니다. 퍼펙트한 자료만이  IBM Certified Deployment Professional C2080-471시험에서 성공할수 있습니다. Pass4Test시험문제와 답이야 말로 퍼펙트한 자료이죠. Pass4Test    IBM Certified Deployment Professional C2080-471인증시험자료는 100% 패스보장을 드립니다.




시험 번호/코드: C2080-471


시험 이름: IBM Marketing Operations V8.6, Deployment


버전: V12.35


업데이트: 2015-03-17


Q & A: 60문항









NO.1 A consultant has been asked to configure IBM Cognos Reports with an
existing IBM Marketing

Operations system.

Cognos is installed correctly
and the Marketing Operations reports are correctly configured
and

dispatched.

The consultant needs to make only certain changes to the
default configuration settings to Marketing

Platform.

Which of the
following parameters must be configured under Settings > Report >
Integrations >

Cognos?

A. Integration Name, Version and Vendor

B.
Domain, Portal URL and Dispatch URL

C. Portal URL, Dispatch URL and
CognosLocation

D. Authentication Mode, Authentication NameSpace and
Authentication datasource name

Answer: B



NO.2 For IBM Marketing
Operations Programs, where does a user find a list of all child projects
for

the program? (This list shows the name of the project, the name of the
project owners, the project

ID, the date and time when the last person
updated the project, the target start and end dates and

the project
status)

A. Summary tab

B. Settings menu

C. Global dashboard

D.
Attachments tab

Answer: A



NO.3 What is the overall hierarchy in IBM
Marketing Operations for marketing activities?

A. IBM_USER: Plans >
Programs > Projects > Subprojects

B. IBM_USER: Plans > Projects >
Subprojects > Programs

C. IBM_USER: Programs > Projects >
Plans

D. IBM_USER: Programs > Plans > Projects >
Subprojects

Answer: A



NO.4 What is the name of the temporary state
where IBM Marketing Operations Projects that are

completed or cancelled can
be re-activated by a user who has a rights to do so? (The user can
then

update the project information and then change the state back to its
previous state "completed" or

"cancelled".)

A. Inactive

B. In
Reconciliation

C. On Hold

D. Pending

Answer: B



NO.5 In IBM
Marketing Operations, in what policy does an administrator set up function
grants or

blocks to identify what each type of user can or cannot do?

A.
Admin

B. User

C. Security

D. Roles

Answer: C



NO.6 Where does
a user connect the approval process to an Approval task in IBM
Marketing

Operations?

A. People tab

B. Summary tab

C. Workflow
tab

D. Attachments tab

Answer: C