IT업계 종사자라면 누구나  VMware Certified Professional VCPC510시험을 패스하고 싶어하리라고 믿습니다. 많은 분들이 이렇게 좋은 인증시험은 아주 어렵다고 생각합니다. 네 맞습니다. 패스할 확율은 아주 낮습니다. 노력하지 않고야 당연히 불가능한 일이 아니겠습니까?  VMware Certified Professi onal VCPC510 험은 기초 지식 그리고 능숙한 전업지식이 필요 합니다. Pass4Test는 여러분들한테 VMware Certified Professional VCPC510시험을 쉽게 빨리 패스할 수 있도록 도와주는 사이트입니다. Pass4Test의   VMware Certified Professional VCPC510시험관련 자료로 여러분은 짧은 시간내에 간단하게 시험을 패스할수 있습니다. 시간도 절약하고 돈도 적게 들이는 이런 제안은 여러분들한테 딱 좋은 해결책이라고 봅니다.

 

 

NO.1 Which three features are only available when using a vSphere Distributed Switch? (Choose
three.)
A. Port Mirroring
B. PVLAN tagging
C. Egress Traffic Shaping
D. Ingress Traffic Shaping
E. 802.1q VLAN Tagging
Answer: A,B,D

NO.2 Which two components are required for a vCloud infrastructure installation? (Choose two.)
A. AMQP Broker
B. vCloud Connector
C. vShield Manager
D. Oracle/MS SQL database
Answer: C,D

NO.3 Which two resources must be in place prior to creating a new Provider vDC? (Choose two.)
A. vCloud External Network
B. vCenter Datastore
C. vCenter Resource Pool
D. vShield Protection Group
Answer: B,C

NO.4 As a System Administrator you can disable an Organization vDC. Disabling will have which of
the
following effects? (Choose two)
A. vApps in the Org vDC that are not running cannot be powered on.
B. All vApps in the Org vDC will be shutdown.
C. Users will not be able to create or start additional vApps in that Org vDC.
D. The running vApps in the Org vDC will have their storage lease reset.
Answer: A,C

NO.5 An administrator attempts to delete the network named Internet but receives an error.
What is a possible reason for the error?
A. The network named Internet is backed by a port group on a vSphere Standard Switch.
B. The vShield Edge appliance on the external network is powered off.
C. The administrator needs to be an Organization Administrator.
D. The network is still in use by an Organization.
Answer: D

NO.6 An administrator would like to have vCenter take action any time a virtual machine is using
over
90% of its available resources for five minutes or longer.
Which three actions can be taken by vCenter Server in response to the trigger without running a
script? (Choose three.)
A. Power on a VM
B. Reboot Guest on VM
C. Increase Virtual Machine Memory
D. Migrate a VM
E. Increase Virtual Machine CPU Shares
Answer: A,B,D

NO.7 On which two vSphere elements can traffic shaping be configured? (Choose two.)
A. On a vSphere Distributed Switch dvPort for inbound and/or outbound traffic
B. On a vSphere Distributed Switch for inbound and/or outbound traffic
C. On a vSphere Standard Switch port group or the entire vSwitch for inbound traffic
D. On a vSphere Standard Switch port group or the entire vSwitch for inbound and outbound traffic
Answer: A,B

NO.8 In a large organization, a user has 10 VMs deployed in vCloud Director, backed by a
Pay-As-You-
Go allocation model. The user needs to determine the charges being incurred for resource usage.
Which report type does the user need?
A. Showback Report
B. Usage Report
C. Cost Comparison Report
D. Cost Report
Answer: D
 