IBM Mastery 00M-503시험덤프공부자료는 Pass4Test제품으로 가시면 자격증취득이 쉬워집니다. Pass4Test에서 출시한 IBM Mastery 00M-503덤프는 이미 사용한 분들에게 많은 호평을 받아왔습니다. 시험적중율 최고에 많은 공부가 되었다고 희소식을 전해올때마다 Pass4Test는 더욱 완벽한 IBM Mastery 00M-503시험덤프공부자료로 수정하고기 위해 최선을 다해왔습니다. 최고품질 IBM Mas tery 00M-503덤프공부자료는 Pass4Test에서만 찾아볼수 있습니다.
NO.1 A customer is running on a 2-core POWER6 520 server and IBM i 6.1. The server hardware
needs
to be upgraded for performance and additional memory capacity. Upgrading to which Power
Systems server will enable this customer to keep the serial number from the 520?
A. Power 740 4-core
B. Power 720 4-core
C. Power 730 8-core
D. Power 720 6-core
Answer: D
NO.2 Which of the following provides the most capacity and satisfies the disk and write cache
protection
rules for IBM i 7.1 when running on a POWER Blade in a BladeCenter S?
A. Mirror the disks using IBM
B. Mirror the disks using VIOS *
C. RAID-5 with two BladeCenter S SAS RAID Controller Modules
D. RAID-5 with a single BladeCenter S SAS RAID Controller Module
Answer: B
NO.3 A customer is planning to consolidate server workloads to multiple partitions running on an
8-core
Power 720 system. They also need to support virtual storage for Windows workload running in a
BladeCenter and AIX and Linux partitions. Which of the following supports virtual storage for
Windows servers?
A. IBM i
B. Virtual I/O Server
C. PowerVM Express Edition
D. VMControl Entry Edition
Answer: A
NO.4 Which of the following is a difference between the Power 720/740 Host Ethernet Adapter
(HEA)
and the Power 520 Integrated Virtual Ethernet (IVE) adapter?
A. Supports 1Gbps speeds
B. Available as a MES
C. Support for RJ-45 ports
D. Supports port virtualization
Answer: D
NO.5 How does the N-2 rule apply when upgrading to IBM i 7.1?
A. A compatibility PTF is required when upgrading from 5.3
B. Two full system saves must be done before upgrading to 7.1.
C. i 5.4 is the oldest version that can upgrade directly to 7.1.
D. MES hardware upgrade must be installed before upgrading to 7.1.
Answer: C
NO.6 Which IBM SAN is supported on BladeCenter S for IBM i, Linux and AIX ?
A. XIV
B. DS3200
C. DS3400
D. DS4800
Answer: B
NO.7 A customer is running a mission critical application on an older POWER6 520 system. They
want
to upgrade to the Power 720 server but leave the application and data on the existing disks. What
is required to meet the customer needs?
A. HSL-2 I/O drawer
B. FC #5796 I/O drawer
C. FC #5877 I/O drawer
D. Olddisks moved to the new server
Answer: D
NO.8 What is a capability of the IBM Workload Estimator?
A. It can plan for VIOS for IBM i.
B. It converts system plans generated by HMC.
C. It can validate plans for initial ordering.
D. It provides input to the System Planning Tool.
Answer: D
IBM Mastery 00M-503덤프자료
Posted 2013/6/5 6:30:30 | Category: 미분류 | Tag: