IT인증,IT자격증,IT자격증시험,IT인증시험

http://www.pass4test.net/

IBM Certified Specialist C4040-122시험공부

많은 사이트에서  IBM Certified Specialist C4040-122인증시험대비자료를 제공하고 있습니다. 그중에서 Pass4Test를 선택한 분들은  IBM Certified Specialist C4040-122시험통과의 지름길에 오른것과 같습니다. Pass4Test는 시험에서 불합격성적표를 받으시면 IBM Certified Specialist C4040-122덤프비용을 환불하는 서비스를 제공해드려 아무런 걱정없이 시험에 도전하도록 힘이 되어드립니다. Pass4Test덤프를 사용하여 IBM Certified Specialist C4040-122시험에서 통과하신 분이 전해주신 희소식이 Pass4Test 덤프품질을 증명해드립니다.







NO.1 A prospective customer is running a database application that cannot be upgraded.

They plan to replace it with a DB2-based server environment that can scale in the future.

The prospect has asked why anyone would choose Power Systems servers when Intel-based servers

cost less.

Which of the following is an effective response?

A. DB2 on Power Systems delivers more than ten times the throughput per core than on Intel due to

exploitation of SMT.

B. Core for core, Intel-based servers have more expensive DB2 software licensing costs when

compared to PowerSystems.

C. Power Systems servers offer a lower TCO due to greater processor power, virealization

technologies and bothhorizontal and vertical growth.

D. Power Systems servers offer superiority in energy-management technologies and use

dramatically less energy whilegenerating much less heat.

Answer: C




NO.2 An environment for a popular ISV application used on Power Systems must be sized.

Which IBM tool or resource should be used?

A. Techline

B. eConfigurator

C. Facts and Features

D. System Planning Tool

Answer: A




NO.3 When moving an HP-UX based application workload from an HP Superdome onto a Power

Systems server, which operating system will provide the easiest transition'?

A. AIX

B. IBMi

C. Red Hat Enterprise Linux

D. SuSe Linux Enterprise Server

Answer: A




NO.4 A customer has two production IBM POWER7+ 750s in the same data center.

The customer has an application in an LPAR that needs to run 24x7.

What is required to allow the planned migration of that LPAR to the second system?

A. A shared Hardware Management Console One dedicated core on each Power 750

B. PowerVM Enterprise Edition on both systems SAN storage accessible to the VIO Servers on each

Power 750

C. Systems Director Enterprise Edition A common shared processor pool on each Power 750

D. PowerVM Standard Edition Dual system accessibility to virtual SCSI or virtual Fibre Channel

Answer: B




NO.5 What is a reason that POWER7 technology can provide higher throughput than Xeon x86

technology?

A. POWER7 supports more DIMM slots than x86.

B. POWER7 has higher redundancy of registers than x86.

C. POWER7 supports more virealization technologies than x86.

D. POWER7 supports 4 threads per core, while Xeon supports only 2.

Answer: D




NO.6 What energy capability of Power Systems can be used in data centers to restrict server energy

consumption, especially in cases where the data center might be nearing the limit of the energy it

can provide?

A. Power Capping

B. EnergyScale for I/O

C. Processor Core Nap

D. Dynamic Power Saver

Answer: A




NO.7 Which of the following Power Systems design functions allows the system to identify

situations which can result in a system outage?

A. Light Path Diagnostics

B. Electronic Service Agent

C. First Failure Data Capture

D. Alternate Processor Recovery

Answer: C




NO.8 What is the benefit of using the Active Memory Expansion feature in Power Systems servers?

A. Memory capacity will virtually be doubled.

B. Memory will be disk-cached to improve performance.

C. Memory will be allocated to an LPARto improve performance.

D. Memory contents are compressed to allow for greater utilization.

Answer: D




Posted 2014/10/20 10:16:27  |  Category: IBM  |  Tag: C4040-122시험공부