Pass4Test사이트에서 제공하는 IASSC ICYB (IASSC Certified Lean Six Sigma Yellow Belt)덤프의 일부 문제와 답을 체험해보세요. 우리 Pass4Test의 를 IASSC ICYB (IASSC Certified Lean Six Sigma Yellow Belt) 덤프공부자료를 선택해주신다면 우리는 최선을 다하여 여러분이 꼭 한번에 시험을 패스할 수 있도록 도와드리겠습니다.만약 여러분이 우리의 인증시험 덤프를 보시고 시험이랑 틀려서 패스를 하지 못하였다면 우리는 무조건 덤프비용 전부를 환불해드릴것입니다. Pass4Test제품으로 자격증을 정복합시다!
NO.1 Benefits and working conditions would be primarily the concern of which of the following?
A. Voice of the Customer
B. Voice of the Employee
C. Voice of the Business
D. Voice of the Process
Answer: B
NO.2 When we assess the Voice of the Customer we are attempting to determine the gaps in our
processes between “what is” and __________________.
A. “What isn’t”
B. “What will make money”
C. “What will cost less”
D. “What should be”
Answer: D
NO.3 Which of the following would likely not be a CTQ (Critical-to-Quality) for the purchase of a
product?
A. Functionality
B. Durability
C. Dependability
D. None
Answer: D
NO.4 The ROI for a project is a measurement metric that stands for Return on Investment and is one
of
the methods used to measure the success of a Lean Six Sigma project.
A. True
B. False
Answer: A
NO.5 The DMAIC approach to problem solving stands for Define, __________, Analyze, Improve and
Control.
A. Manage
B. Measure
C. Memorize
D. Manipulate
Answer: B
NO.6 Voice of the Customer is a Lean Six Sigma technique to determine the ___________ attributes
of
a product or service.
A. Desirable
B. Beneficial
C. Critical-to-Quality
D. Preferred
Answer: C
NO.7 Six Sigma refers to a process whose output has at least 95% of its data points within 6
Standard
Deviations from the Mean.
A. True
B. False
Answer: B
NO.8 In the expression Y = f(Xn) Y , the output, is the ___________ variable and Xn, the inputs, are
the
__________ variables.
A. Independent, dependent
B. Individual, multiple
C. Sole, multiple
D. Dependent, independent
Answer: D
NO.9 Training cost is $3,000 and a project required an initial investment of $12,000. If the project
yields
monthly savings of $1,800 beginning after 3 months, what is the payback period in months (before
money costs and taxes)?
A. 4.17
B. 8.33
C. 11.33
D. 28.28
Answer: C
NO.10 When a process has proven itself to function at a Six Sigma level this means there are less than
________ defects per million opportunities.
A. 1.7
B. 2.6
C. 3.4
D. 10
Answer: C
IASSC ICYB (IASSC Certified Lean Six Sigma Yellow Belt)인증덤프
Posted 2013/6/1 6:01:17 | Category: 미분류 | Tag: