IASSC ICYB (IASSC Certified Lean Six Sigma Yellow Belt)시험에 도전해보려고 하는데 공부할 내용이 너무 많아 스트레스를 받는 분들은 지금 보고계시는 공부자료는 책장에 다시 넣으시고 Pass4Test의 IASSC ICYB (IASSC Certified Lean Six Sigma Yellow Belt)덤프자료에 주목하세요. Pass4Test의 IASSC ICYB (IASSC Certified Lean Six Sigma Yellow Belt) 덤프는 오로지 IASSC ICYB (IASSC Certified Lean Six Sigma Yellow Belt)시험에 대비하여 제작된 시험공부가이드로서 시험패스율이 100%입니다. 시험에서 떨어지면 덤프비용전액환불해드립니다.
NO.1 Six Sigma refers to a process whose output has at least 95% of its data points within 6
Standard
Deviations from the Mean.
A. True
B. False
Answer: B
NO.2 The ROI for a project is a measurement metric that stands for Return on Investment and is one
of
the methods used to measure the success of a Lean Six Sigma project.
A. True
B. False
Answer: A
NO.3 When a process has proven itself to function at a Six Sigma level this means there are less than
________ defects per million opportunities.
A. 1.7
B. 2.6
C. 3.4
D. 10
Answer: C
NO.4 Which of the following would likely not be a CTQ (Critical-to-Quality) for the purchase of a
product?
A. Functionality
B. Durability
C. Dependability
D. None
Answer: D
NO.5 Voice of the Customer is a Lean Six Sigma technique to determine the ___________ attributes
of
a product or service.
A. Desirable
B. Beneficial
C. Critical-to-Quality
D. Preferred
Answer: C
NO.6 Training cost is $3,000 and a project required an initial investment of $12,000. If the project
yields
monthly savings of $1,800 beginning after 3 months, what is the payback period in months (before
money costs and taxes)?
A. 4.17
B. 8.33
C. 11.33
D. 28.28
Answer: C
NO.7 Benefits and working conditions would be primarily the concern of which of the following?
A. Voice of the Customer
B. Voice of the Employee
C. Voice of the Business
D. Voice of the Process
Answer: B
NO.8 When we assess the Voice of the Customer we are attempting to determine the gaps in our
processes between “what is” and __________________.
A. “What isn’t”
B. “What will make money”
C. “What will cost less”
D. “What should be”
Answer: D
NO.9 In the expression Y = f(Xn) Y , the output, is the ___________ variable and Xn, the inputs, are
the
__________ variables.
A. Independent, dependent
B. Individual, multiple
C. Sole, multiple
D. Dependent, independent
Answer: D
NO.10 The DMAIC approach to problem solving stands for Define, __________, Analyze, Improve and
Control.
A. Manage
B. Measure
C. Memorize
D. Manipulate
Answer: B