IT인증자격증만 소지한다면 일상생활에서 많은 도움이 될것입니다. 하지만 문제는 어떻게  간단하게 시험을 패스할것인가 입니다. Pass4 Test는 IT전문가들이 제공한 시험관련 최신 연구자료들을 제공해드립니다.Pass4Test을 선택함으로써 여러분은 성공도 선택한것이라고 볼수 있습니다. Pass4Test의  IASSC ICGB (IASSC Certified Lean Six Sigma Green Belt)시험대비 덤프로  IASSC ICGB (IASSC Certified Lea n Six Sigma Green Belt)시험을 패스하세요.

 

 

NO.1 When it comes to Control one of the most effective means of eliminating defects is to

_________________ .

A. Train personnel often and thoroughly

B. Keep a Six Sigma project going on the process at all times

C. Design defect prevention into the product

D. Have each process consist of no more than five steps

Answer: C

 

NO.2 The Lean Principle action in the 5S approach that deals with having those items needed

regularly

at hand and those items need less regularly stored out of the way is known as ___________.

A. Shining

B. Standardizing

C. Sustaining

D. Sorting

Answer: D

 

NO.3 As part of a Visual Factory plan __________ cards are created and utilized to identify areas in

need of cleaning and organization.

A. Kanban

B. Kaizen

C. Poke-Yoke

D. WhoSai

Answer: A

 

NO.4 SPC on the outputs is more preferred than SPC on the inputs when implementing SPC for your

process.

A. True

B. False

Answer: B

 

NO.5 The use of station warning lights, tool boards and jidohka devices in the application of Lean

accomplish which of these principles?

A. Pilferage Minimization

B. Visual Factory

C. Management Awareness

D. Operator Attentiveness

Answer: B

 

NO.6 When a Belt applies the practice of Poka-Yoke to a project challenge she is attempting to make

certain the activity is _______________ .

A. Well documented

B. Removed from the line

C. Mistake proofed

D. Highly visible

Answer: C

 

NO.7 The use of Kanbans work best with pull systems for determining the timing of which products

or

services are produced.

A. True

B. False

Answer: A

 

NO.8 A Lean Principle that addresses efficiency by the process worker is called

____________________?

A. Visual Factory

B. Supervising

C. Training

D. Standardizing

Answer: D

 

NO.9 While management of a company must set the stage for all improvement efforts, which of

these

5S’s is primarily driven by management?

A. Straighten

B. Sort

C. Shine

D. Sustain

Answer: D

 

NO.10 Significant variation in process performance is a consequence of several causes that can be

classified using which of the terminologies shown. (Note: There are 2 correct answers).

A. Common

B. Random

C. Uneducated

D. Special

E. Vital

Answer: A,D

 

 