NO.1 Which type of Join would you select for the Join Stage to output unmatched records from both
input data sources?
A. Inner join
B. Left outer join
C. Right outer join
D. Full outer join
Answer: D

NO.2 In Blueprint Director, how do you easily recognize that an element contains a subdiagram?
A. There is a little ?icon associated with the elementThere is a little ??icon associated with the
element
B. There is a little green arrow associated to the element
C. There is a little ??icon associated with the element
D. Double clicking the element is the only way to find out
Answer: C

NO.3 A customer reports that their installation failed with an error, indicating that the PMSetup
could not be run and that the mrDPMServer3 service failed to start. From the pre-installation tasks
of Data Collection, what are the missing permissions for the Running User which could lead to that
error?
A. "Profile single process" and "Profile system performance"
B. "Create a token object" and "Create a pagefile?"Create a token object" and "Create a pagefile
C. "Debug programs" and "Create global objects"
D. "Log on as a service" and "Log on as a batch job"
Answer: D

NO.4 In DataStage Sequential File Stage, how is a NULL value represented?
A. By a space character
B. By a 'NULL' string
C. A -1 for an integer field and an empty string for a VARCHAR field
D. As defined by the Developer in the extended properties of the field
Answer: D

NO.5 Which of the following is a standard practice when using partition parallelism?
A. Disable the pipeline parallelism for all the stages that can run in parallel
B. Setup a configuration file defining multiple CPUs for each logical node
C. Avoid repartitioning if possible
D. All of the above
Answer: C

NO.6 Which of the following statements about Blueprint Director is incorrect?
A. Blueprint Director will display the time needed to perform individual tasks
B. You can browse and search Information Server metadata assets
C. You can create new blueprints from standard reference architecture templates
D. Reference architectures contain detailed method guidance for required activities
Answer: A

NO.7 A DataStage job can be executed from_______________
A. DataStage Administrator client only
B. DataStage Administrator or Director client
C. DataStage Director client only
D. DataStage Designer or Director client.
Answer: D

NO.8 Which tool below can be used to assign permissions to users for each DataStage project?
A. Information Server Web Console
B. DataStage Administrator
C. DataStage Director
D. DataStage Designer
Answer: B