아직도 ASTQB Advanced Level ISTQB-Advanced-Lev1 시험준비를 어떻게 해야 할지 망설이고 계시나요? 고객님의 IT인증시험준비길에는 언제나 Pass4Test가 곁을 지켜주고 있습니다. Pass4Test시험공부자료를 선택하시면 자격증취득의 소원이 이루어집니다. ASTQB Advanced Level ISTQB-Advanced-Lev1 시험덤프는 Pass4Test가 최고의 선택입니다.
NO.1 According to ISTQB syllabus, systems of systems;
I. Contain interconnected hardware, software applications and communications.
II. Include big bang merging of independent collaborating systems to avoid creating the
entire system from scratch.
III. Can be less reliable than individual systems
IV. Characteristics include; long duration of projects, version management and regression
tests at systems of systems level.
A. I, II and IV are true.
B. I, II are true and III is false.
C. I, III, and IV are true, II is false.
D. II,III and IV are true, I is false.
Answer: C
NO.2 You and two junior testers have been assigned to a new project qualification by your manager.
Development of the code started two weeks ago and now you are invited to attend a code review
meeting by development manager. Meeting agenda is to cover following items.
# Verify code compliance to coding standards
# Verify comment usage frequency
# Review number of function calls
# Review logical decision points in the application
What is the purpose of this meeting?
A. Perform a Static Analysis of the code with the intention of finding bugs early.
B. Explain the testers how the program should work.
C. Get an agreement to release the partially completed software to the testing department.
D. Explain the complexity of the code.
Answer: A
NO.3 Software Testers in a software development company installed the new release on test
systems and started the testing phase.
Testers verified the new functionality, performed necessary security testing and completed planned
regression tests.
During the last week of testing, testers noticed that the memory utilization was more than 95% on
two of the test
servers (out of 4 servers). This behavior was not observed during the first weeks of the testing phase.
As a test analyst, what would you do?
A. Ignore the problem because other two servers are okay (memory utilization is normal)
B. Report the problem to the developer immediately and create a defect report because it could be
a problem related to memory leak.
C. Reboot the system so that memory utilization will come back to normal. Not report it as a
problem.
D. Create a defect report and reboot the system to correct the memory problem.
Answer: B
NO.4 Integrated Solutions Inc. is a software testing company with 20 testers. One of their clients
provided a software release and requested to test the software within 2 weeks.
The client did not provide any specifications of the software or any documentation.
However, Integrated Solutions Inc. testers have tested similar releases from the same client in the
past. As a Senior Software Tester, what is your best approach?
A. Test the product using "Defect and Experienced Based" techniques like error guessing,
exploratory and attacks.
B. Request for more time.
C. Explain the client why you cannot test the software.
D. Test only performance of the software.
Answer: A
NO.5 Select the correct statement;
A. Testing processes are interconnected and related to activities like requirements
engineering, software development, etc.
B. Testing tasks cannot be concurrent.
C. Requirements engineering and software testing are two isolated activities.
D. Testing activities / processes do not have to be aligned to the chosen software
development lifecycle model.
Answer: A
NO.6 Which of the following statements are false?
I. Test execution starts when the system entry criteria are met (or waived) and test
execution ends when exit criteria are met.
II. System test environment creation might start during system design in V-model III.
Long term prospects needs to be considered when selecting test process or tools. IV.
Daily/weekly scrum meetings are part of agile testing method.
A. I and II and false.
B. II, III and IV are false
C. I, II, III are false
D. None of them are false
Answer: D
NO.7 Select the correct statement related to test techniques;
I. Software program should be running to perform dynamic analysis
II. Software program should be running to perform static analysis
III. Control flow analysis is part of dynamic analysis
IV. Data flow analysis is part of static analysis
A. I, II true. III, IV false
B. I, III true. II, IV false
C. I, IV true. II, III false
D. I true. II, III, IV false
Answer: C