IT인증,IT자격증,IT자격증시험,IT인증시험

http://www.pass4test.net/

SAP Certified Technology Professional P-SD-64 최신덤프

SAP Certified Technology Professional P-SD-64 시험패스는 고객님의 IT업계종사자로서의 전환점이 될수 있습니다.자격증을 취득하여 승진 혹은 연봉협상 방면에서 자신만의 위치를 지키고 더욱 멋진 IT인사로 거듭날수 있도록 고고싱할수 있습니다. Pass4Test의 SAP Certified Technology Professional P-SD-64 덤프는 시장에서 가장 최신버전으로서 시험패스를 보장해드립니다.







NO.1 In which areas does the Business Content that is delivered with SAP Global
Trade

Services (GTS)

enable your customer to perform strategic reporting?
(Choose two)

A. Transport processing

B. Customs processing

C. Duty rate
procedure

D. Transit procedure

Answer: B,D



NO.2 What are the
advantages of an ATP check in SAP SCM compared to an ATP check in

SAP
ERP?

(Choose two)

A. Higher system performance

B. Simultaneous access
to identical products

C. Reduced master data maintenance

D. Elimination of
stock shortage

Answer: A,B



NO.3 Your customer is unable to post goods
issue, although material availability is

confirmed with ATP for that

date.
Shipment scheduling is carried out in SAP ECC.

What is the reason?

A. The
scheduling is progressive and planned receipts are evaluated at the beginning of
the

day.

B. The scheduling is conservative and planned receipts are
evaluated at the end of the day.

C. The scheduling is total conservative and
planned receipts with confirmed material

availability after



NO.4 Which
object do you use to switch on the ATP check?

A. Requirement class

B.
Checking rule

C. Requirement type

D. Strategy group

Answer:
A



NO.5 Your customer has implemented sales order management using all
available scenarios

in SAP ERP.

They plan to extend their business
processes by using SAP CRM.

For which scenario do you advise them to use
CRM?

A. Contract Management

B. Inquiry Management

C. Opportunity
Management

D. Quotation Management

Answer: C



NO.6 00 p.m. are
evaluated on the next day.

D. The scheduling is exact and planned receipts
are evaluated at 12:00 p.m. of the day.

Answer: A

12. Your customer is
using ATP check including replenishment lead time which is not

maintained
in

material master.

Which time indicators are used in this case?

A.
In-house production: goods receipt processing time + pick/pack time

B.
External procurement: purchasing department processing time + planned delivery
time

C. In-house production: in-house production time + pick/pack time

D.
External procurement: planned delivery time + loading time

Answer:
B



NO.7 How do you characterize the principle of the availability
check?

A. First Come - First Served

B. Last In - First Out

C. First In
- First Out

D. First Expired - First Out

Answer: A



NO.8 Your
customer is regularly facing long time periods between the creation of the
delivery

and the

creation of the invoice for export customers. They are
asking you for an option to update the

export data

in export
invoices.

What is a possible solution?

A. Activate customer BAdI in the
invoice.

B. Configure standard copy control.

C. Define commodity
codes.

D. Enable direct billing type access to the material export
data.

Answer: B



Posted 2014/7/4 10:58:40  |  Category: SAP  |  Tag: P-SD-64 최신덤프