IT인증,IT자격증,IT자격증시험,IT인증시험

http://www.pass4test.net/

IBM certifications II 000-106 덤프공부

IT 자격증은 CISA, CISSP, CEH, CCNA, CCNP, CCSP, CCIE, LPIC, RHCE, MCITP, OCJP등의 자격증이 있으며 상기 자격증을 모두 준비하실 필요는 없고 진출분야 에 맞게 준비를 하시는게 좋습니다.Pass4Test의  IBM certifications II 000-106덤프는 고객님의 IT인증자격증을 취득하는 소원을들어줍니다. IT업계에 금방 종사한 분은 자격증을 많이 취득하여 자신만의 가치를 업그레이드할수 있습니다. Pass4Test의  IBM certifications II 000-106덤프는 실제 시험문제에 대비하여 연구제작된 퍼펙트한 시험전 공부자료로서 시험이 더는 어렵지 않게 느끼도록 편하게 도와드립니다. Pass4Test의  IBM certifications II 000-106덤프자료를 공부하면 한방에 시험패스하는것을 굳게 약속드립니다. Pass4Test의 IBM certifications II 000-106덤프로 공부하여 시험불합격받으면 바로 덤프비용전액 환불처리해드리는 서비스를 제공해드리기에 아무런 무담없는 시험준비공부를 할수 있습니다.

 

 

NO.1 A customer changed processor and memory resources to an LPAR dynamically using DLPAR, but the
changes are not retained after the partition is shut down and reactivated.
What will resolve this situation?
A.Recycle power to the managed system.
B.Make the changes in the system profile.
C.Make the changes in the partition profile.
D.Use ASMI to apply the changes to the hypervisor.
Answer:C

NO.2 A customer with limited rack space wants to purchase a 4-core POWER7 server with a total of four 8Gb
Fibre Channel adapters and four 2-port Ethernet adapters. Which server is the least expensive solution
that meets the customer's requirements?
A.Power 710
B.Power 720
C.Power 740
D.Power 750
Answer:B

NO.3 Which statement concerning Multiple Shared Processor Pools (MSPPs) in Power Systems is correct?
A.PowerVM Enterprise Edition is required.
B.MSPPs have an associated Uncapped Weight.
C.Capped and Uncapped LPARs can exist in MSPPs.
D.Either AIX 6.1 or IBM i 6.1 (or later) is required.
Answer:C

NO.4 A customer would like to have the ability to permanently activate processor and memory resources as
their workload increases. Which of the following supports the customer requirement?
A. Reserve Capacity on Demand
B. Utility Capacity on Demand
C. Capacity Upgrade on Demand
D. Uncapped Capacity on Demand
Answer: C

NO.5 What is the maximum number of hardware threads possible on an 8-core Power 720?
A.8
B.16
C.32
D.64
Answer:C
 
Posted 2013/5/15 7:40:27  |  Category: 미분류  |  Tag: