IT인증,IT자격증,IT자격증시험,IT인증시험

http://www.pass4test.net/

Microsoft 70-463덤프자료

근 몇년간IT산업이 전례없이 신속히 발전하여 IT업계에 종사하는 분들이 여느때보다 많습니다. 경쟁이 이와같이 치열한 환경속에서 누구도 대체할수 없는 자기만의 자리를 찾으려면 IT인증자격증취득은 무조건 해야 하는것이 아닌가 싶습니다. Microsoft 70-463시험은 IT인증시험중 가장 인기있는 시험입니다. Pass4Test에서는 여러분이  Microsoft 70-463시험을 한방에 패스하도록 실제시험문제에 대비한 인증 Microsoft 70-463덤프를 발췌하여 저렴한 가격에 제공해드립니다.시험패스 못할시 덤프비용은 환불처리 해드리기에 고객님께 아무런 페를 끼치지 않을것입니다.







NO.1 You maintain a SQL Server Integration Services (SSIS) package.The package was developed by using

SQL Server 2008 Business Intelligence Development Studio (BIDS).

The package includes custom scripts that must be upgraded.

You need to upgrade the package to SQL Server 2012.

Which tool should you use?

A.SSIS Upgrade Wizard in SQL Server 2008 BIDS

B.SSIS Upgrade Wizard in SQL Server Data Tools

C.SQL Server DTExecUI utility (dtexecui.exe)

D.SQL Server dtexec utility (dtexec.exe)

Answer: B




NO.2 You are reviewing the design of an existing fact table named factSales, which is loaded from a SQL

Azure database by a SQL Server Integration Services (SSIS) package each day.The fact table has

approximately 1 billion rows and is dimensioned by product, sales date, and sales time of day.

The database administrator is concerned about the growth of the database.Users report poor reporting

performance against this database.Reporting requirements have recently changed and the only

remaining report that uses this fact table reports sales by product name, sale month, and sale year.No

other reports will be created against this table.

You need to reduce the report processing time and minimize the growth of the database.

What should you do?

A.Partition the table by product type.

B.Create a view over the fact table to aggregate sales by month.

C.Change the granularity of the fact table to month.

D.Create an indexed view over the fact table to aggregate sales by month.

Answer: C




NO.3 DRAG DROP

A new SQL Server Integration Services (SSIS) project is deployed to the SSIS catalog.

To troubleshoot some data issues, you must output the data streaming through several data flows into text

files for further analysis.You have the list of data flow package paths and identification strings of the

various task components that must be analyzed.

You need to create these output files with the least amount of administrative and development effort.

Which three stored procedures should you execute in sequence? (To answer, move the appropriate

actions from the list of actions to the answer area and arrange them in the correct order.)

Answer:




NO.4 You install a SQL Server 2012 database engine instance on a production server.A month later, you

install SQL Server 2012 Integration Services (SSIS).

You must develop an SSIS project and deploy it to the server by using the Project Deployment model.

Operations Log records that are outside the configured retention period must be cleaned automatically.

You need to create the SSIS catalog on the production server.

What should you do? (Each correct answer presents part of the solution.Choose all that apply.)

A.Enable XP Command Shell.

B.Enable CLR Integration.

C.Enable OLE Automation.

D.Start the SQL Server Browser service.

E.Enable Cross Database Ownership Chaining.

F.Start the SQL Server Agent service.

G.Enable Ad Hoc Remote Queries.

Answer: FA




NO.5 You are implementing the indexing strategy for a fact table in a data warehouse.The fact table is

named Quotes.The table has no indexes and consists of seven columns:

[ID]

[QuoteDate]

[Open]

[Close]

[High]

[Low]

[Volume]

Each of the following queries must be able to use a columnstore index:

SELECT AVG ([Close]) AS [AverageClose] FROM Quotes WHERE [QuoteDate] BETWEEN '20100101'

AND '20101231'.

SELECT AVG([High] - [Low]) AS [AverageRange] FROM Quotes WHERE [QuoteDate] BETWEEN

'20100101' AND

'20101231'.

SELECT SUM([Volume]) AS [SumVolume] FROM Quotes WHERE [QuoteDate] BETWEEN '20100101'

AND '20101231'.

You need to ensure that the indexing strategy meets the requirements.The strategy must also minimize

the number and size of the indexes.

What should you do?

A.Create one columnstore index that contains [ID], [Close], [High], [Low], [Volume], and [QuoteDate].

B.Create three coiumnstore indexes:

One containing [QuoteDate] and [Close]

One containing [QuoteDate], [High], and [Low]

One containing [QuoteDate] and [Volume]

C.Create one columnstore index that contains [QuoteDate], [Close], [High], [Low], and [Volume].

D.Create two columnstore indexes:

One containing [ID], [QuoteDate], [Volume], and [Close]

One containing [ID], [QuoteDate], [High], and [Low]

Answer: C




NO.6 You develop a SQL Server Integration Services (SSIS) package that imports SQL Azure data into a data

warehouse every night.

The SQL Azure data contains many misspellings and variations of abbreviations.To import the data, a

developer used the Fuzzy Lookup transformation to choose the closest-matching string from a reference

table of allowed values.The number of rows in the reference table is very large.

If no acceptable match is found, the Fuzzy Lookup transformation passes a null value.

The current setting for the Fuzzy Lookup similarity threshold is 0.50.

Many values are incorrectly matched.

You need to ensure that more accurate matches are made by the Fuzzy Lookup transformation without

degrading performance.

What should you do?

A.Change the Exhaustive property to True,

B.Change the similarity threshold to 0.55.

C.Change the similarity threshold to 0.40.

D.Increase the maximum number of matches per lookup.

Answer: B




NO.7 You are reviewing the design of a customer dimension table in an existing data warehouse hosted on

SQL Azure.

The current dimension design does not allow the retention of historical changes to customer attributes

such as Postcode.

You need to redesign the dimension to enable the full historical reporting of changes to multiple customer

attributes including Postcode.

What should you do?

A.Add StartDate and EndDate columns to the customer dimension.

B Add an IsCurrent column to the customer dimension.

C.Enable Snapshot Isolation on the data warehouse.

D.Add CurrentValue and PreviousValue columns to the customer dimension.

Answer: A




NO.8 DRAG DROP

A SQL Server Integration Services (SSIS) project has been deployed to the SSIS catalog.The project

includes a project Connection Manager to connect to the data warehouse.The SSIS catalog includes two

Environments:

Development

QA

Each Environment defines a single Environment Variable named ConnectionString of type string.The

value of each variable consists of the connection string to the development or QA data warehouses.

You need to be able to execute deployed packages by using either of the defined Environments.

Which three actions should you perform in sequence? (To answer, move the appropriate actions from the

list of actions to the answer area and arrange them in the correct order.)

Answer:




NO.9 You are developing a SQL Server Integration Services (SSIS) package.

To process complex scientific data originating from a SQL Azure database, a custom task component is

added to the project.

You need to ensure that the custom component is deployed on a test environment correctly.

What should you do?

A.Add an OnError event handler to the SSIS project.

B.Open a command prompt and run the gacutil command.

C.Configure the SSIS solution to use the Project Deployment Model.

D.Open a command prompt and run the dtexec /dumperror /conn command.

E.Configure the output of a component in the package data flow to use a data tap.

F.Open a command prompt and execute the package by using the SQL Log provider and running the

dtexecui.exe utility.

G.Open a command prompt and run the dtexec /rep /conn command.

H.Run the dtutil command to deploy the package to the SSIS catalog and store the configuration in SQL

Server.

I.Use an msi file to deploy the package on the server.

J.Open a command prompt and run the dtutil /copy command.

K.Create a reusable custom logging component and use it in the SSIS project.

Answer: B




NO.10 You are designing a data warehouse for a software distribution business that stores sales by software

title.It stores sales targets by software category.Software titles are classified into subcategories and

categories.Each software title is included in only a single software subcategory, and each subcategory is

included in only a single category.The data warehouse will be a data source for an Analysis Services

cube.

The data warehouse contains two fact tables:

factSales, used to record daily sales by software title

factTarget, used to record the monthly sales targets by software category

Reports must be developed against the warehouse that reports sales by software title, category and

subcategory, and sales targets.

You need to design the software title dimension.The solution should use as few tables as possible while

supporting all the requirements.

What should you do?

A.Create three software tables, dimSoftware, dimSoftwareCategory.and dimSoftwareSubcategory and a

fourth bridge table that joins software titles to their appropriate category and subcategory table records

with foreign key constraints.Direct the cube developer to use key granularity attributes.

B.Create three software tables, dimSoftware, dimSoftwareCategory, and

dimSoftwareSubcategory.Connect factSales to all three tables and connect factTarget to

dimSoftwareCategory with foreign key constraints.Direct the cube developer to use key granularity

attributes.

C.Create one table, dimSoftware, which contains Software Detail, Category, and Subcategory

columns.Connect factSales to dimSoftware with a foreign key constraint.Direct the cube developer to use

a non-key granularity attribute for factTarget.

D.Create two tables, dimSoftware and dimSoftwareCategory.Connect factSales to dimSoftware and

factTarget to dimSoftwareCategory with foreign key constraints.Direct the cube developer to use key

granularity attributes.

Answer: C




NO.11 A SQL Server Integration Services (SSIS) package on a computer is failing periodically in

production.The package was created less than one year ago and was deployed to the SSIS catalog.

Sometimes the package is started on a SQL Agent schedule; sometimes the package is started manually

by an SSIS developer by using the Object Explorer in SQL Server Management Studio.

You need to identify the authenticated user responsible for starting the package each time it failed in the

past.

Where can you find this information?

A.the SQL Server Log

B.the SSISDB.[catalog].[executions] view

C.the SSISDB.[catalog].[event_messages] view

D.the SQL Agent Job History

E.the SQL Agent Error Log

Answer: B




NO.12 You are designing a data warehouse with two fact tables.The first table contains sales per month and

the second table contains orders per day.

Referential integrity must be enforced declaratively.

You need to design a solution that can join a single time dimension to both fact tables.

What should you do?

A.Create a time mapping table.

B.Change the level of granularity in both fact tables to be the same.

C.Merge the fact tables.

D.Create a view on the sales table.

Answer: C




NO.13 You develop and deploy a SQL Server Integration Services (SSIS) package.

The package is stored in the file system.

You need to execute the package without importing it to the SSIS server.

What should you use to execute the package? (Each correct answer presents a complete

solution.Choose all that apply.)

A.catalog.start_package

B.dtexec

C.SQL Server Management Studio

D.SQL Server Agent

Answer: CA




NO.14 DRAG DROP

A SQL Server Integration Services (SSIS) package named DataFeed interacts with an external vendor

data feed.The package is executed several times a day, either as part of other packages' control flow or

by itself.The external data feed is unreliable because network failures and slow response times are

frequent.The package is currently deployed on the file system.

To analyze the reliability of the external data feed, you must collect execution data.Every time the

DataFeed package is executed, the following information must be logged:

Start Time

End Time

Execution Result

Execution Duration

You need to design a logging solution that meets the requirements by using the least amount of

administrative and development effort.

Which three actions should you perform in sequence? (To answer, move the appropriate actions from the

list of actions to the answer area and arrange them in the correct order.)

Answer:




NO.15 You are designing a data warehouse hosted on SQL Azure.The data warehouse currently includes the

dimUser and dimDistrict dimension tables and the factSales fact table.The dimUser table contains records

for each user permitted to run reports against the warehouse; and the dimDistrict table contains

information about sales districts.

The system is accessed by users from certain districts, as well as by area supervisors and users from the

corporate headquarters.

You need to design a table structure to ensure that certain users can see sales data for only certain

districts.Some users must be permitted to see sales data from multiple districts.

What should you do?

A.Add a district column to the dimUser table.

B.Partition the factSales table on the district column.

C.Create a userDistrict table that contains primary key columns from the dimUser and dimDistrict tables.

D.For each district, create a view of the factSales table that includes a WHERE clause for the district.

Answer: C




NO.16 DRAG DROP

You are editing a SQL Server Integration Services (SSIS) package that contains a task with a sensitive

property.

You need to create a project parameter and configure it so that its value is encrypted when it is deployed

to the SSIS catalog.

Which three steps should you perform in sequence? (To answer, move the appropriate actions from the

list of actions to the answer area and arrange them in the correct order.)

Answer:




NO.17 To facilitate the troubleshooting of SQL Server Integration Services (SSIS) packages, a logging

methodology is put in place.The methodology has the following requirements:

The deployment process must be simplified.

All the logs must be centralized in SQL Server.

Log data must be available via reports or T-SQL.

Log archival must be automated.

You need to configure a logging methodology that meets the requirements while minimizing the amount of

deployment and development effort.

What should you do?

A.Open a command prompt and run the gacutil command.

B.Open a command prompt and execute the package by using the SQL Log provider and running the

dtexecui.exe utility.

C.Add an OnError event handler to the SSIS project.

D.Use an msi file to deploy the package on the server.

E.Configure the output of a component in the package data flow to use a data tap.

F.Run the dtutil command to deploy the package to the SSIS catalog and store the configuration in SQL

Server.

G.Open a command prompt and run the dtexec /rep /conn command.

H.Open a command prompt and run the dtutil /copy command.

I.Open a command prompt and run the dtexec /dumperror /conn command.

J.Configure the SSIS solution to use the Project Deployment Model.

K.Create a reusable custom logging component and use it in the SSIS project.

Answer: J




NO.18 You are designing an enterprise star schema that will consolidate data from three independent data

marts.One of the data marts is hosted on SQL Azure.

Most of the dimensions have the same structure and content.However, the geography dimension is

slightly different in each data mart.

You need to design a consolidated dimensional structure that will be easy to maintain while ensuring that

all dimensional data from the three original solutions is represented.

What should you do?

A.Create a junk dimension for the geography dimension.

B.Implement change data capture.

C.Create a conformed dimension for the geography dimension.

D.Create three geography dimensions.

Answer: C




NO.19 You are developing a SQL Server Integration Services (SSIS) project that copies a large amount of

rows from a SQL Azure database.The project uses the Package Deployment Model.This project is

deployed to SQL Server on a test server.

You need to ensure that the project is deployed to the SSIS catalog on the production server.

What should you do?

A.Open a command prompt and run the dtexec /dumperror /conn command.

B.Create a reusable custom logging component and use it in the SSIS project.

C.Open a command prompt and run the gacutil command.

D.Add an OnError event handler to the SSIS project.

E.Open a command prompt and execute the package by using the SQL Log provider and running the

dtexecui.exe utility.

F.Open a command prompt and run the dtexec /rep /conn command.

G.Open a command prompt and run the dtutil /copy command.

H.Use an msi file to deploy the package on the server.

I.Configure the SSIS solution to use the Project Deployment Model.

J.Configure the output of a component in the package data flow to use a data tap.

K.Run the dtutil command to deploy the package to the SSIS catalog and store the configuration in SQL

Server.

Answer: I




NO.20 You are developing a project that contains multiple SQL Server Integration Services (SSIS)

packages.The packages will be deployed to the SSIS catalog.One of the steps in each package accesses

an FTP site to download sales transaction data.

You create project parameters to store the username and password that are used to access the FTP site.

You need to ensure that the username and password values are encrypted when they are deployed.

What should you do?

A.set the Sensitive property of the parameters to True.

B.Set the ProtectionLevel property of the package to EncryptSensitiveWithUserKey.

C.Change the parameters to package parameters.

D.Change the project to the Legacy Deployment model.

Answer: A







Posted 2014/4/28 13:26:18  |  Category: Microsoft  |  Tag: Microsoft 70-463