IT인증,IT자격증,IT자격증시험,IT인증시험

http://www.pass4test.net/

CCIE 350-060 (CCIE SP Operations Written Exam)공부자료

Pass4Test 는 아주 우수한 IT인증자료사이트입니다. Pass4Test에서 여러분은   CCIE 350-060 (CCIE SP Operations Written Exam) 인증시험관련 덤프를 얻을수 있습니다. Pass4Test 사이트에서 제공하는   CCIE 350-060 (CCIE SP Operations Written Exam) 관련자료의 일부분 문제와 답 등 샘플을 무료로 다운받아 체험해볼 수 있습니다. 그리고 Pass4Test에서는  CCIE 350-060 (CCIE SP Operations Written Exam)  자료구매 후 추후 업데이트되는 동시에 최신버전을 무료로 발송해드립니다. 우리는   CCIE 350-060 (CCIE SP Operations Written Exam)  인증시험관련 모든 자료를 여러분들에서 제공할 것입니다. Pass4Test 의 IT전문 팀은 부단한 업계경험과 연구를 이용하여 정확하고 디테일 한 시험문제와 답으로 여러분이 아주 간단히    CCIE 350-060 (CCIE SP Operations Written Exam) 시험을 패스할 수 있도록 최선을 다하고 있습니다.

 

 

NO.1 Which three of following metrics are used to troubleshoot an incident of poor voice quality in a service
provider next-generation network? It can be assumed that adequate bandwidth is available. (Choose
three.)
A. UDP jitter
B. latency
C. TCP Connect
D. packet loss
E. round-trip time
Answer: A,D,E

NO.2 According to ITIL v3 framework, which type of warranty assurance provide a customer with a
measured confidence that services are supporting defined level of demand and quality?
A. security
B. availability
C. capacity
D. continuity
E. fulfillment
Answer: C

NO.3 According to ITIL v3 framework, which type of tools is best suited to ensure management of a
predefined workflow stream containing a set of tasks which can be managed around resource availability,
timelines, status, and if needed escalation paths?
A. process control engine
B. configuration management system
C. discovery audit
D. business service management
Answer: A

NO.4 You are working as a Tier 2 NOC employee at a service provide. The service provisioning team has
opened a trouble ticket indicating that their provisioning application is timing out while provisioning new
MPLS VPNs for a large customer. They believe it is a network problem because not every site is
experiencing the provisioning failure. No actual customers have reported any network problems. Upon
receiving the ticket in you work queue, you perform basic troubleshooting steps and find that ping,
traceroute, and Telnet work to all the sites. You begin to doubt that the network is at fault. Which two steps
should you take before escalating to Tier 3? (Choose two.)
A. Suggest that the provisioning team reboot their servers.
B. Check for packet loss on the network path to the affected sites.
C. Review all network change requests that were submitted prior to the problem having started.
D. Verify that the ACLs are not preventing provisioning traffic.
Answer: C,D

NO.5 Why are threshold defined based on baseline documents?
A. to ensure that QoS parameters are defined appropriately
B. to help identify current network problems and predict future bottlenecks
C. to suppress duplicate alarms and allow for event correlation
D. to reduce polling traffic on the network E. to verify that interfaces are in the correct state
Answer: B

NO.6 According to ITIL v3 framework, which improvements should be implemented if there is an increase
in the number of false positive auto-generated incidents?
A. Update the known error database.
B. Modify the thresholds error database.
C. Modify the thresholds in the network management system
D. Update the service desk procedures.
Answer: B

NO.7 A rollout plan from engineering has been sent to the NOC for deployment. Part of the plan involves a
complex software upgrade to a network element. The method of procedure provided by engineering is
nearly 100 individual steps long. Where do you expect to find backout procedures to be specified?
A. after each stop that causes a change to the network
B. after every 20 (+/-5) steps
C. after the midway point
D. after the method of procedure is completed
E. both after the midway point and after the method of procedure is completed
Answer: D

NO.8 A service provider upgraded its core routers to CRS-1. The service provider connects the CRS-1 to an
internal network via CRS-1 management ports. This internal network is configured with private IP
addresses. All SSH access from a service provider workstation that is incoming to the management ports
of the CRS-1 routers was tested and was found to be working properly. The routers were configured for
AAA by using the Cisco Secure Access Control Server, and AAA was working as desired. Furthermore,
SNMP traffic used the inband 10-Gigabit Ethernet ports, and all SNMP functionality was properly
configured and tested prior to the rollout. After CRS-1 routers were placed in production, a need arose to
engage Cisco TAC to perform troubleshooting and diagnosis on the routers. It was noted that while all
service provider operations staff could access the routers from the private IP-based management network,
Cisco TAC could not access the router because its connection was coming in on the inband 10-Gigabit
Ethernet ports. The VTY line ACLs were configured to allow the Cisco TAC source IP address, but that did
not fix the problem. What is a possible cause for the lack of connectivity? (Choose one.)
A. Local packet transport service is misconfigured.
B. The Cisco IOS XR administration plane is misconfigured.
C. The Cisco IOS XR IPv4 virtual address is not configured to be used as a source address.
D. Management plane protection is misconfigured.
Answer: D

NO.9 The service provider that you work for decided to offer its business customers a new, hosted unified
communications service. This service will allow the service provider to maintain in its data centers all the
call managers and related hardware and software so that businesses can outsource the function to your
company. Engineering has crafted a rollout plan for this new service. From the NOC support perspective,
what are the three main considerations to take into account to support the new service? (Choose three.)
A. The SP data center has adequate power, heating, and cooling capacity.
B. The documentation is complete.
C. The network bandwidth to each customer site is sufficient.
D. The service desk has received proper training.
E. The troubleshooting procedures are established.
Answer: B,D,E

NO.10 You are working in a service provider voice NOC supporting a national VoIP network. The network
underwent a capacity expansion that added voice bearer trunks to a newly deployed media gateway. After
the new trunks were configured and placed into live service, the service desk began to receive complaints
from end customers that their VoIP service is not working for certain calls, the service desk is unable to
resolve the problem and due to increasing troubles coming in, they escalate to you.
A. Verify IP connectivity between the media gateway controller and the media gateway.
B. Fail over the media gateway to its backup.
C. Identify which trunks are not functioning.
D. Verify that SIP versions are compatible between the media gateway controller and the media gateway.
Answer: D

NO.11 Which protocol should be configured on networking devices to assist operational staff in event
correlation to resolve service issues?
A. NTP
B. TACACS
C. HSRP
D. TFTP
E. RCMD
Answer: A

NO.12 There is a defective egress queuing ASIC in the data path of a router. Under certain conditions, the
ASIC may flip a bit from a large data packet from 0 to 1. The bit flip can occur only on a bit postion greater
than 128 bytes. What is the accurate statement about FTP flow transiting through this ASIC over a PPP
SONET port?
A. The downstream router will detect the bit error with PPP CRC check an correct the problem.
B. The downstream router will detect the bit error with PPP CRC check and drop the packet.
C. The downstream router will detect the bit error with IP checksum and drop the packet.
D. The downstream router will detect the bit error with TCP checksum and drop the packet.
E. The downstream router will not detect the bit error, but TCP on the sending host will retransmit the
corrupted segment.
Answer: E

NO.13 While evaluating a new hardware rollout plan before deployment, which standards should you review to
ensure that the hardware met certain environmental design guidelines?
A. NAS
B. COBIT
C. ITIL
D. NEBS
E. eTOM
Answer: D

NO.14 According to ITIL v3 framework, which type of service operational management process monitors the
network infrastructure to identify and escalate abnormal operational conditions?
A. problem management
B. incident management
C. event management
D. request fulfillment
Answer: C

NO.15 What the main difference between an SNMP trap and a syslog message?
A. SNMP traps are secure, whereas syslog messages are not.
B. SNMP traps are triggered during network outages, whereas syslog messages are informational only.
C. SNMP traps are forwarded to EMS systems, whereas syslog messages are forwarded to any NMS
system.
D. SNMP traps are user-definable and very based on vendor, whereas syslog messages are
standards-based.
Answer: D
 
Pass4Test 의    CCIE 350-060 (CCIE SP Operations Written Exam) 자료로 자신만만한 시험 준비 하시기를 바랍니다. 우리를 선택함으로 자신의 시간을 아끼는 셈이라고 생각하시면 됩니다.  CCIE 350-060 (CCIE SP Operations Written Exam) 로 빠른 시일내에 자격증 취득하시고  CCIE 350-060 (CCIE SP Operations Written Exam)   IT업계중에 엘리트한 전문가로 되시기를 바랍니다.
Posted 2013/1/9 3:23:03  |  Category: 미분류  |  Tag: