IT인증,IT자격증,IT자격증시험,IT인증시험

http://www.pass4test.net/

ASTQB ISTQB-Advanced-Lev1덤프자료

Pass4Test의 ASTQB ISTQB-Advanced-Lev1시험덤프는 실제시험의 기출문제와 예상문제를 묶어둔 공부자료로서 시험문제커버율이 상당히 높습니다.IT업계에 계속 종사하려는 IT인사들은 부단히 유력한 자격증을 취득하고 자신의 자리를 보존해야 합니다. Pass4Test의 ASTQB ISTQB-Advanced-Lev1시험덤프로 어려운 ASTQB ISTQB-Advanced-Lev1시험을 쉽게 패스해보세요. IT자격증 취득이 여느때보다 여느일보다 쉬워져 자격증을 많이 따는 꿈을 실현해드립니다.

 

NO.1 Select the correct statement;

A. Testing processes are interconnected and related to activities like requirements

engineering, software development, etc.

B. Testing tasks cannot be concurrent.

C. Requirements engineering and software testing are two isolated activities.

D. Testing activities / processes do not have to be aligned to the chosen software

development lifecycle model.

Answer: A

 

NO.2 Integrated Solutions Inc. is a software testing company with 20 testers. One of their clients

provided a software release and requested to test the software within 2 weeks.

The client did not provide any specifications of the software or any documentation.

However, Integrated Solutions Inc. testers have tested similar releases from the same client in the

past. As a Senior Software Tester, what is your best approach?

A. Test the product using "Defect and Experienced Based" techniques like error guessing,

exploratory and attacks.

B. Request for more time.

C. Explain the client why you cannot test the software.

D. Test only performance of the software.

Answer: A

 

NO.3 Software Testers in a software development company installed the new release on test

systems and started the testing phase.

Testers verified the new functionality, performed necessary security testing and completed planned

regression tests.

During the last week of testing, testers noticed that the memory utilization was more than 95% on

two of the test

servers (out of 4 servers). This behavior was not observed during the first weeks of the testing phase.

As a test analyst, what would you do?

A. Ignore the problem because other two servers are okay (memory utilization is normal)

B. Report the problem to the developer immediately and create a defect report because it could be

a problem related to memory leak.

C. Reboot the system so that memory utilization will come back to normal. Not report it as a

problem.

D. Create a defect report and reboot the system to correct the memory problem.

Answer: B

 

NO.4 According to ISTQB syllabus, systems of systems;

I. Contain interconnected hardware, software applications and communications.

II. Include big bang merging of independent collaborating systems to avoid creating the

entire system from scratch.

III. Can be less reliable than individual systems

IV. Characteristics include; long duration of projects, version management and regression

tests at systems of systems level.

A. I, II and IV are true.

B. I, II are true and III is false.

C. I, III, and IV are true, II is false.

D. II,III and IV are true, I is false.

Answer: C

 

NO.5 Select the correct statement related to test techniques;

I. Software program should be running to perform dynamic analysis

II. Software program should be running to perform static analysis

III. Control flow analysis is part of dynamic analysis

IV. Data flow analysis is part of static analysis

A. I, II true. III, IV false

B. I, III true. II, IV false

C. I, IV true. II, III false

D. I true. II, III, IV false

Answer: C

 

NO.6 Which of the following statements are false?

I. Test execution starts when the system entry criteria are met (or waived) and test

execution ends when exit criteria are met.

II. System test environment creation might start during system design in V-model III.

Long term prospects needs to be considered when selecting test process or tools. IV.

Daily/weekly scrum meetings are part of agile testing method.

A. I and II and false.

B. II, III and IV are false

C. I, II, III are false

D. None of them are false

Answer: D

 

NO.7 You and two junior testers have been assigned to a new project qualification by your manager.

Development of the code started two weeks ago and now you are invited to attend a code review

meeting by development manager. Meeting agenda is to cover following items.

# Verify code compliance to coding standards

# Verify comment usage frequency

# Review number of function calls

# Review logical decision points in the application

What is the purpose of this meeting?

A. Perform a Static Analysis of the code with the intention of finding bugs early.

B. Explain the testers how the program should work.

C. Get an agreement to release the partially completed software to the testing department.

D. Explain the complexity of the code.

Answer: A

 

Posted 2014/8/19 10:40:15  |  Category: ASTQB  |  Tag: ISTQB-Advanced-Lev1덤프자료