IT인증,IT자격증,IT자격증시험,IT인증시험

http://www.pass4test.net/

IBM Mastery 00M-503덤프공부가이드

IBM Mastery 00M-503시험에 도전해보려고 없는 시간도 짜내고 거금을 들여 학원을 선택하셨나요? 사실 IT인증시험은 보다 간단한 공부방식으로 준비하시면 시간도 돈도 정력도 적게 들일수 있습니다. 그 방법은 바로 Pass4Test의  IBM Mastery 00M-503시험준비덤프자료를 구매하여 공부하는 것입니다. 문항수도 적고 시험예상문제만 톡톡 집어 정리된 덤프라 시험합격이 한결 쉬워집니다.

 

 

NO.1 Which of the following is a difference between the Power 720/740 Host Ethernet Adapter

(HEA)

and the Power 520 Integrated Virtual Ethernet (IVE) adapter?

A. Supports 1Gbps speeds

B. Available as a MES

C. Support for RJ-45 ports

D. Supports port virtualization

Answer: D

 

NO.2 What is a capability of the IBM Workload Estimator?

A. It can plan for VIOS for IBM i.

B. It converts system plans generated by HMC.

C. It can validate plans for initial ordering.

D. It provides input to the System Planning Tool.

Answer: D

 

NO.3 Which of the following provides the most capacity and satisfies the disk and write cache

protection

rules for IBM i 7.1 when running on a POWER Blade in a BladeCenter S?

A. Mirror the disks using IBM

B. Mirror the disks using VIOS *

C. RAID-5 with two BladeCenter S SAS RAID Controller Modules

D. RAID-5 with a single BladeCenter S SAS RAID Controller Module

Answer: B

 

NO.4 A customer is planning to consolidate server workloads to multiple partitions running on an

8-core

Power 720 system. They also need to support virtual storage for Windows workload running in a

BladeCenter and AIX and Linux partitions. Which of the following supports virtual storage for

Windows servers?

A. IBM i

B. Virtual I/O Server

C. PowerVM Express Edition

D. VMControl Entry Edition

Answer: A

 

NO.5 Which IBM SAN is supported on BladeCenter S for IBM i, Linux and AIX ?

A. XIV

B. DS3200

C. DS3400

D. DS4800

Answer: B

 

NO.6 How does the N-2 rule apply when upgrading to IBM i 7.1?

A. A compatibility PTF is required when upgrading from 5.3

B. Two full system saves must be done before upgrading to 7.1.

C. i 5.4 is the oldest version that can upgrade directly to 7.1.

D. MES hardware upgrade must be installed before upgrading to 7.1.

Answer: C

 

NO.7 A customer is running a mission critical application on an older POWER6 520 system. They

want

to upgrade to the Power 720 server but leave the application and data on the existing disks. What

is required to meet the customer needs?

A. HSL-2 I/O drawer

B. FC #5796 I/O drawer

C. FC #5877 I/O drawer

D. Olddisks moved to the new server

Answer: D

 

NO.8 A customer is running on a 2-core POWER6 520 server and IBM i 6.1. The server hardware

needs

to be upgraded for performance and additional memory capacity. Upgrading to which Power

Systems server will enable this customer to keep the serial number from the 520?

A. Power 740 4-core

B. Power 720 4-core

C. Power 730 8-core

D. Power 720 6-core

Answer: D

 
Posted 2013/6/5 6:29:49  |  Category: 미분류  |  Tag: