IT인증,IT자격증,IT자격증시험,IT인증시험

http://www.pass4test.net/

VCE-CIIE 210-010덤프

Pass4Test에서 출시한  VCE-CIIE 210-010덤프는 실제시험문제 커버율이 높아 시험패스율이 가장 높습니다. VCE-CIIE 210-010시험을 통과하여 자격증을 취득하면 여러방면에서 도움이 됩니다. Pass4Test에서 출시한  VCE-CIIE 210-010덤프를 구매하여  VCE-CIIE 210-010시험을 완벽하게 준비하지 않으실래요? Pass4Test의 실력을 증명해드릴게요.

 

NO.1 On a Vblock System 320, each VMware ESXi host will boot from a SAN-attached boot drive
presented from the EMC VNX array.
Which statement is true according to VCE standards for boot LUNs?
A. Use Fibre Channel drives to create a RAID group, use RAID-5 4+1 RAID group, then create a 20 GB
LUN.
B. Use Fibre Channel drives to create a RAID group, use RAID-5 7+1 RAID group, then create a 20 GB
LUN.
C. Use SAS drives to create a RAID group, use RAID-5 4+1 RAID group, then create a 20 MB LUN.
D. Use SAS drives to create a RAID group, use RAID-5 4+1 RAID group, then create a 20 GB LUN.
Answer: D

NO.2 During a Vblock System 320 deployment, the customer wants to disassociate four half-width
blades in a single chassis for a future project.
Which tool is used to perform this compute reconfiguration?
A. vSphere
B. CIMC
C. Unisphere
D. UCSM
Answer: D

NO.3 During a Vblock System logical build, which three configuration changes require Unified
Computing System Manager (UCSM) access? (Choose three.)
A. fabric interconnect interfaces
B. ESXi host Network Time Protocol
C. service profiles
D. Cisco Nexus 1000V
E. UCS Smart Call Home
Answer: A,C,E

NO.4 After the installing the Cisco Nexus 1000V, the administrator uses the command show svs
connections.
This command shows the connection status of which component?
A. ESXi host
B. vCenter server
C. Secondary Virtual Supervisor Module
D. VMware Update Manager (VUM)
Answer: B

NO.5 Which three VLANs are required during the implementation of the Cisco Nexus 1000V in Layer
2 mode? (Choose three.)
A. native VLAN
B. control VLAN
C. management VLAN
D. system VLAN
E. packet VLAN
Answer: B,C,E

NO.6 Which protocol is used to provide unified file storage connectivity to a Vblock System 320?
A. FCoE
B. IP
C. iSCSI
D. FC
Answer: B

NO.7 Which component connects a Vblock System 720 to a customer's network aggregation layer?
A. Cisco Nexus 5548UP
B. Cisco Catalyst 3750-X
C. Cisco MDS 9148
D. Cisco UCS Fabric Interconnect 6296UP
Answer: A

NO.8 During a Vblock System logical build, which two management components within Unified
Computing System Manager (UCSM) require configuration with an IP address? (Choose two.)
A. fabric extender
B. fabric interconnect
C. UCSM
D. Cisco Nexus 5108 chassis
Answer: B,C

Posted 2014/10/22 13:37:45  |  Category: VCE  |  Tag: 210-010덤프